Procurement Summary
Country: Slovakia
Summary: Steam Boiler Fnsp
Deadline: 18 May 2026
Posting Date: 04 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140616426
Document Ref. No.: 302058-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 911483.31
CPV Classification
42162000 - Steam-generating boilers
42160000 - Boiler installations
45223100 - Assembly of metal structures
45255400 - Fabrication work
45231112 - Installation of pipe system
45262680 - Welding
45223210 - Structural steelworks
71314000 - Energy and related services
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services
38424000 - Measuring and control equipment
71250000 - Architectural, engineering and surveying services
45259000 - Repair and maintenance of plant
45262640 - Environmental improvement works
42511100 - Heat-exchange units
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
STEAM BOILER FNSP The subject of the work is the solution to the installation of one new three-pass flame tube steam boiler with accessories, with an output of approx. 4000 kg/h (the exact value of the output will be determined when drawing up the DRS, with regard to optimization operating parameters during summer and winter operation), with an integrated stainless steel economizer in the space of the current gas steam boiler plant of NsP Žilina. The mentioned new boiler will be installed in the boiler room, instead of the dismantled ČKD 6 t/h boiler. The new boiler will serve for the production of medium-pressure saturated steam, which will be used for air conditioning heating and technological purposes, in individual objects of FNsP Žilina. When replacing the new boiler with the original ČKD 6 t/h boiler, the output of the boiler room is reduced. We assume that the current ventilation a the existing exhaust area is satisfactory from the point of view of work safety and will not be interfered with during the reconstruction of the boiler house. Part of the work implementation also includes the installation of a new water treatment plant to ensure the water quality requirements of the boilers. Accessories of boilers is a heat treatment system for feed water, a discharge and cooling module, a condensate module, a feed pump pumping module (2 pumps), a condensate pump pumping module (2 pumps) and a condensate quality monitoring module. The mentioned technology it is further supplemented by a water and condensate treatment plant and an expansion filling machine. The boiler room will be operated with occasional service. According to STN 07 0703, it is a category I gas boiler room, located in a separate...
Document Type: Contract Notice Reference Number: VS ZIL 7 Contract Type: supplies Estimated Value: 911483.31 - EUR Authority Type: pub-undert Doc Title: PARNÝ KOTOL FNSP Dispatch Date: 2026-04-30 Publish Date: 2026-05-04 Submission Date: 2026-05-18
Documents
Tender Notice