Procurement Summary
Country: Azerbaijan
Summary: Special Item
Deadline: 08 May 2025
Posting Date: 18 Apr 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 117893641
Document Ref. No.: 109493
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: AZN 365337.39
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
2, EN-13445-3, the fire class should be defined as 1A 34b. The Balloon process temperature must be from -30 C to + 60 C. The cylinder test pressure should be 35 bars, while the service pressure should be 15 bars. Filling accuracy must be provided with a mass index of +/- 2%. 8 during the minimum effective release of the balloonThere must be seconds and the distance of release should be at least 2 meters. The working principle must be in accordance with the standard IS: 15683: 2018, installation and technical care should be implemented in accordance with IS: 2190. When it comes to structure properties, neck rings should be combined with the top of the cylinderand the mounting rope must be provided in size of M30 X 1.5. The valve must be in a squeezing holder type and the mounting rope should be in the size of the M30. The cylinder should be a deep laying cylinder, and the pressure should be between 0-28 bar and should be designed in accordance with IS 15683. Siphon Tube should be attached to the valve rig and releaseAdditions should be equipped with a plastic hose header. Also, the balloon should be provided with sealing and damage indicators. The fire class should be 2A 55B. The processing temperature should range between -30 C and + 60 C.The cylinder test pressure should be 35 bars, while the service pressure should be 15 bars. Filling accuracy must be provided with a mass index of +/- 2%. The balloon should be 13 seconds during minimum effective release and the distance of graduation should be at least 2 meters. Principle of Working IS: 15683 must comply with the standard, installationAnd the technical care should be carried out in accordance with IS: 2190.
Structure features are also important: neck rings should be combined with the welding of the cylinder, and the valve should be in the tightening type. The mounting rope should be provided in the size of the M30, the cylinder must be a deep drawing cylinder.The pressure should be between 0-28 bar and ...
Number of required bidders: 2
Opening date and time of envelopes: 08.05.2025 17: 20
The final submission date and time of offers: 2025-05-08
Documents
Tender Notice