Procurement Summary
Country: USA
Summary: Sources Sought Jbe 089 Crh Simulator Facility Building Brand Name Requirements
Deadline: 29 Sep 2026
Posting Date: 16 Sep 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 149210515
Document Ref. No.: W911KB26RA030-1
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
SOURCES SOUGHT: THIS NOTICE IS MARKET RESEARCH TO SUPPORT INCLUSION OF SOLE SOURCE (BRAND NAME)
SPECIFICATIONS IN A CONSTRUCTION PROJECT - JBE 089 CRH SIMULATOR FACILITY BUILDING, JBER,
ALASKA - AND IS NOT A REQUEST FOR PROPOSAL.
The U.S. Army Engineer District, Alaska intends to specify the below listed items as part of a larger construction
contract to be executed on JBER, Alaska. A determination by the Government to not compete this
requirement, for the specific items listed below, based on the responses to this notice is solely within the discretion
of the Government. Reference RFO 6.103-1(d), “Only One Responsible Source and No Other Supplies or Services Will
Satisfy Agency Requirements - Application for brand name descriptions.”
Items:
1. Monaco Transceiver MAAP-X Alarm Control Panel: The Fire Department utilizes a Monaco D-21 supervising station for monitoring the fire alarm systems in all buildings on the installation. The fire alarm system in each facility must have the capability to communicate with the installation-wide systems.
2. Best Interchangable Core-Cormax, 7-pin, Standard Keyway: Elmendorf has established Best as the Installation-s master keying system with which all lock cores and keyless entry systems must be compatible.
3. Federal Signal Mass Notification Panel: The building mass notification systems (BMNS) is required to interface with the JBER Federal Signal Remote Mass Notification ACU-s unit for emergency broadcasts in all facilities.
4. PowerLogic ION 8650: Every new building or facility is required to have a smart energy meter that will be able to automatically log energy usage and report the logged data to a central energy management database. It must meet Cyber security reuirements and AMRS compatibility.
5. Meridan EMCS System: All new individual building controls systems be connected to and fully compatible with the existing base-wide building control and monitoring system. The systems must be...
Documents
Tender Notice