Procurement Summary
Country: Denmark
Summary: Skybreak Project in Lersøparken
Deadline: 18 Sep 2026
Posting Date: 06 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146636090
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45100000 - Site preparation work
45246000 - River regulation and flood control works
45232130 - Storm-water piping construction work
45200000 - Works for complete or part construction and civil engineering work
45112000 - Excavating and earthmoving work
45111200 - Site preparation and clearance work
45112711 - Landscaping work for parks
45262500 - Masonry and bricklaying work
45262600 - Miscellaneous special-trade construction work
45232454 - Rain-water basin construction work
45262522 - Masonry work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Subcontract: LOT-0001 Title: Skybreak project in Lersøparken Description: The undertaking is construction work and includes a cloud-breaking project located in Lersøparken and covering an area of approx. 95, 000 square meters. The purpose of the project is the handling of approx. 16, 500 m3 of surface water, which is led into the park through HOFOR's pipe solutions in Bispebjerg Bakke and Lygten Kanal. On the eastern and western sides of the park, the water is brought to the surface through two inflow structures and via channels further down to a wet trickling meadow and a basin with a permanent water table. Lersøparken is protected, and an exemption from the protection has therefore been granted in connection with the cloudburst project. The construction work includes the establishment of smaller structures, run-off structures, gutters and a breakwater splint. Approach buildings and gutters must be lined with bricks due to requirements in the exemption from the conservation of the park. The construction work includes terrain regulation in an area with soil in different degrees of contamination, where mapping has shown areas with highly contaminated soil. There must be the contract is handled and land is driven away according to the authorities' conditions. Due to the geological conditions in Lersøparken, the construction work includes groundwater lowering in the upper and deep groundwater reservoir. The drainage project mainly consists of construction of pipes that carry the water from HOFOR's wells at Bispebjerg Bakke to the gutters and basin. The pipes run inside the inlet structures. To make room for the pool, the existing playground will be moved, ...
Deadline: 2026-09-18 Place of performance: Denmark, City of Copenhagen (DK011), Copenhagen Description: The undertaking is construction work and includes a cloud-breaking project located in Lersøparken and covering an area of approx. 95, 000 square meters. The purpose of the project is the handling of approx. 16, 500 m3 of surface water, which is led into the park through HOFOR's pipe solutions in Bispebjerg Bakke and Lygten Kanal. On the eastern and western sides of the park, the water is brought to the surface through two inlet structures and via channels further down to a wet trickle meadow and a pool with a permanent water surface. Lersøparken is protected, and an exemption from the protection has therefore been granted in connection with the cloudburst project. The construction work includes the establishment of smaller structures, access structures, gutters and a cloudburst splinter. Access structures and gutters must be lined with brick due to requirements in exemption from the preservation of the park. The construction work includes terrain regulation in an area with soil in different degrees of contamination, where mapping has shown areas with heavily contaminated soil. In the contract, soil must be handled and removed in accordance with the authorities' conditions. Due to the geological conditions in Lersøparken, the construction work includes groundwater lowering in the upper and deep aquifer. The drainage project mainly consists of the construction of pipes that carry the water from HOFOR's wells at Bispebjerg Bakke to the gutters and the basin. The pipes run inside the inlet structures. To make room for the pool, the e...
Documents
Tender Notice