Procurement Summary
Country : USA
Summary : Sb028-25 Sandalwood Community Improvements Project
Deadline : 17 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 121073101
Document Ref. No. : PE-66751-NONST-2025-000000058
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The Work To Be Performed Consists Of, But Is Not Limited To, The Following Major Items: Part 1: Overall Site Development Plans ¿ Dumpster And Clubhouse Area ¿ New Kiosk Area ¿ General Civil/site Work Associated With Dam Reconstruction ¿ Pavement Rehabilitation ¿ New Hope Road Improvements Part 2: Maintenance Plan For Sandalwood Lake Consisting Of Dredging, Silt Removal, And Shoreline Improvements. ¿ Drainage And Lowering The Lake As Needed To Complete Removal Of Accumulate Silt, Sediment And Debris And Soil Along With Grading Of The Lake Side Slopes. ¿ Installation Of Erosion Control And Bmps. ¿ Traffic Control. ¿ Removal Of Silt, Debris, And Soil Off The Site. ¿ Grading Of Side Slopes And Shoreline Per Contractor Drawings. ¿ Installation Of Grassing/mulch And Erosion Blanket As Shown On The Drawings. ¿ All Work Shall Comply With All Federal, State And Local Requirements And Specifications. ¿ Traffic Control Is To Be Provided By The Contractor. Part 3: Rehabilitation Plans For Sandalwood Lake Dam Part 4: Sandalwood Water Main Improvements
NIGP Discription: Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc., Construction, Industrial Pipeline Insulation, Including Maintenance, Repair And Installation, Construction, Pipe Culvert, Dam And Levee Construction, Maintenance, Management And Repair, Dredging Services, Construction, Streets, Major And Residential, Including Reconstruction
Start Date (ET) : Jun 17, 2025 @ 03:35 PM
Documents
Tender Notice