Procurement Summary
Country: USA
Summary: Sam Houston Trail Bridge Replacement
Deadline: 29 May 2026
Posting Date: 11 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141039579
Document Ref. No.: 127EAV26R0009
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
April 10, 2026
The purpose of this amendment is to:
1.Update and provide responses to questions.
2. Extend solicitation from April 17, 2026, to May 29, 2026, 1400 CST.
1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals
necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes:
1.1.1 Phase A: Site Investigation and Analysis
1.1.2 Phase B: Design and Construction Document Preparation
1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings,
and construction and connecting of trail approaches from the existing trail to the new crossings.
1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.
1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1, 000, 000 and $5, 000, 000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty an...
Notice ID: 127eav26r0009
Department/Ind. Agency: agriculture, department of
Original Set Aside: total small business set-aside (far 19.5)
Sub-tier: forest service
Office: southwestern regional office, region 3
Product Service Code: y1lb - construction of highways, roads, streets, bridges, and railways
NAICS Code: 237310 - Highway, Street, and Bridge Construction
Inactive Dates: jun 13, 2026
Inactive Policy: 15 days after date offers due
Documents
Tender Notice
Documents.zip