Procurement Summary
Country: Finland
Summary: Ruokasenkatu Bridge Construction Contract
Deadline: 27 Jan 2026
Posting Date: 10 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 133446068
Document Ref. No.: ROIDNO-2026-85
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The contract area is located in Rovaniemi on Ruokasenkatu crossing Vt4, where a new bridge crossing Vt4 to Ruokasenkatu will be built and the old pedestrian bridge crossing Vt4 will be demolished. Alitava highway 4 is four-lane at the bridge site. A bridge to be built is located in a different location than the footbridge to be dismantled. In addition, water supply structures and street structures will be built on Ruokasenkatu at the intersection of Poromihentie. A reinforced concrete continuous slab bridge 12.5 m+14.0 m+14.0 m+11.0 m will be built on the bridge site. The bridge is in the horizontal plane is straight and the slant is 103.05 gon. The total length of the bridge is 59.1 m and the useful width is 16.0 m. The intermediate supports of the bridge are rectangular pillars 3 pcs/ support line. Intermediate support T4 is located in the 1.5 m wide area between the driving lanes. I support T4 the pillars are shaped from the lower end into the shape of a concrete railing element. The concrete railing continues on both sides of the pillar, so the pillar acts as part of the railing and a direct collision with the pillar is prevented. The support lines of all supports are perpendicular to the measuring line of the crossing road in relation to. All the supports of the bridge are established on the ground. The cross-section of the bridge is slab-like, the edges of which are beveled from the outer edge of the edge beam, measured at a distance of 2.6 m. The lower surface of the slab is horizontal in the transverse direction of the bridge, and the upper surface is shaped to cross according to the cross section of the street. The bridge deck is rigidly attached to the intermediate girders. The ends of the bridge have rubber plate bearings that allow movement in all directions. The bridge rests longitudinally on the embankment with the...
Published:09/01/2026 Deadline for submitting questions:16/01/2026 Deadline for tenders:27/01/2026
Documents
Tender Notice