Procurement Summary
Country: New Zealand
Summary: Rotorua Lakes Councilthis Contract is to Replace Approximately 3Km of Water Rider-Mains Within the Existing Residential Area of Lynmore, Rotorua. Included in this Contract is Separable Portion #1, Whi...
Deadline: 20 Oct 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 127455246
Document Ref. No.: RDC-1140930
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Rotorua Lakes CouncilThis contract is to replace approximately 3km of water rider-mains within the existing residential area of Lynmore, Rotorua. Included in this contract is Separable Portion #1, which is for around 200m of 280mm and 180mm watermain on SH5 in Owhata, Rotorua. The works consists of: Preparation and implementation of a Quality Plan. Setting out of proposed pipeline routes. The supply and installation of valves and hydrants as shown on the Drawings. Provision of all Traffic Control during contract works. Liaison with relevant Utility Authorities and house occupiers prior to and during investigation and protection/restoration of adjacent utility services. Testing, disinfection and commissioning of all new reticulation. The removal or backfilling of all abandoned hydrants, valves, markings as required. Reinstate the ground areas. The supply of materials, labour, plant, tools, transport and accommodation for the proper completion of the work. Provision of "As Built" dimensions, fittings and location information to Council's records. All other work indicated, described or implied on any of the Drawings, in the General or Special Conditions of Contract, or in this Specification. The contract consists of eight (8) separable portions. Under this contract, works shall not be conducted at more than two separable portions at any one time. Failure to adhere to this prerequisite will impair on payments of contractor claims, meaning no claims will be honoured for two months and/or whilst more than two separable portions are being worked on at the same time. The maintenance of the Works in good repair for a period of 12 months for each separable portion. Installation of new mains & riders shall include excavation of the trench, jointing & bedding pipework, installing all required bends, tees, end caps, anchor blocks, valves, hydrants and associated surface boxes and markings, backfilling and compaction of the trench. All pipe work shall have blue water main indicat...
Documents
Tender Notice