Procurement Summary
Country : Ireland
Summary : Request for Tender for the Installation and Insulation of Duct Work at Smartply Europe Dac ‘25
Deadline : 02 May 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 117599822
Document Ref. No. : 5472755
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
SMARTPLY Europe DAC is seeking suitably qualified Engineering Companies to install Ducting at our plant in Belview Port, Slieverue, via Waterford. It is envisaged that the works will take place during the SmartPly-s Annual Shutdown, 25th of August - 4th of September 2025. Please note that the successful Bidder is responsible for the Installation of the Ducting (Free Issue - Ducting will be Procured in advance by Smartply from the OEM), Including the supply, delivery and fitting of the Insulation material and lagging, as well as any materials, components, plant and labour to complete the works as set-out in the Scope of Works. Due to the nature of works as set out in this Tender and other maintenance + construction activity being carried out on site, these have been deemed to be ‘-CONSTRUCTION WORK-- as per the HSA-s Safety Health and Welfare at Work (Construction) Regulations 2013. The successful Bidder will operate as “CONTRACTOR-- and will be required to provide site specific Risk Assessments, Method Statements, Training + Induction Records and Plant Certification, or other requested Information associated with the works, too the PSCS. Client: SmartPly - Belview Port, Slieverue, via Waterford. Contact: Ronnie Roux - 051 831 420 PSDP + PSCS: SmartPly - Belview Port, Slieverue, via Waterford. Contact: Ronnie Roux - 051 831 420 The Contractor is responsible for the following… 1. Removal of existing Ducting and Insulation 2. Installation of 11 pieces of SS duct Ø710 (Free Issue) (Total length ~32m) 3. Source + supply Rockwool (150mm) insulation, galvanised wire netting and lagging and steel banding. 4. Fitting of insulation and lagging to new ducting 5. Managing construction site and traffic Management 6. All Lifting Equipment and Access platforms to carry out works. 7. Preliminaries and Insurance 8. Commissioning 9. Handover Documentation 10. Health + Safety General Description of Medite Facility Procedure Lockout-tag out (LOTO) or lock and tag is a safety procedure ...
Procedure : Open
Publication Date : 02/05/2025
Deadline : 02/05/2025 15:00:00
Documents
Tender Notice