Procurement Summary
Country: Canada
Summary: Request for Proposal: Fitzsimmons Creek Bank Protection Project
Deadline: 26 May 2026
Posting Date: 14 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141242404
Document Ref. No.: T110-05
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Resort Municipality of Whistler invites qualified Proponents to provide proposals to install erosion protection measures for a section of Fitzsimmons Creek bank downstream of the Lost Lake Entrance Bridge at Passive House. Fitzsimmons creek is a dynamic creek with a history of debris-laden flash floods during heavy weather, carrying a heavy sediment load of gravels and cobbles from the source catchments and from the steep channel upstream of the RMOW. Due to flash flooding and the steep channel grade, the right bank of the creek is experiencing erosion and instability. This project seeks to install 3 rock spurs to act as a barrier limiting erosion at the base of the bank. The rock spurs will be constructed of riprap and will be placed into the creek. As the Project is dependent on regulatory approval of the proponent-s proposed workplan, the RMOW reserves the right to defer the works to the 2027 in‑stream work window. This will be necessary should the regulatory permits not be obtained in sufficient time to complete the works within the 2026 fisheries timing window. Any such deferral shall be subject to revised pricing based on the British Columbia Consumer Price Index.
Solicitation Type : RFP - Request for Proposal (Formal) Reference Number : 00005040957 Location : British Columbia Purchase Type : Not Stated Dates Publication : 2026/05/13 09:54:00 AM EDT Closing Date : 2026/05/26 05:00:00 PM EDT Contact Information : Luc Perreault : [email protected] : Description : The Resort Municipality of Whistler invites qualified Proponents to provide proposals to install erosion protection measures for a section of Fitzsimmons Creek bank downstream of the Lost Lake Entrance Bridge at Passive House. Fitzsimmons creek is a dynamic creek with a history of debris-laden flash floods during heavy weather, carrying a heavy sediment load of gravels and cobbles from the source catchments and from the steep channel upstream of the RMOW. Due to flash flooding and the steep channel grade, the right bank of the creek is experiencing erosion and instability. This project seeks to install 3 rock spurs to act as a barrier limiting erosion at the base of the bank. The rock spurs will be constructed of riprap and will be placed into the creek. As the Project is dependent on regulatory approval of the proponent’s proposed workplan, the RMOW reserves the right to defer the works to the 2027 in‑stream work window. This will be necessary should the regulatory permits not be obtained in sufficient time to complete the works within the 2026 fisheries timing window. Any such deferral shall be subject to revised pricing based o...
Documents
Tender Notice