Procurement Summary
Country: Canada
Summary: Replace Metal Soffits
Deadline: 17 Jul 2026
Posting Date: 24 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143899199
Document Ref. No.: GOC990346-CT
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Contractor shall provide all labour, materials, equipment, supervision, and services required to complete the work as described within all associated procurement documents and as shown on the project drawings and indicated within both the Architectural and Electrical drawings and Specifications.All work can be done after hours, or during regular business hours, Monday to Friday. Day work is only permitted if the work is not disruptive to the operation of the building or its occupants. Scaffolding, if used, must be certified, and comply with all applicable safety standards. All electrical work must be certified. The contractor must ensure that access to the building is not obstructed and proper signage in both English and French will be required. Any closures will require a minimum of 2 weeks- notice for the client.
Solicitation Type : ITB - Invitation to Bid (Formal) Reference Number : 0000325485 Location : Canada, National Capital Region, All of National Capital Region Description : The Contractor shall provide all labour, materials, equipment, supervision, and services required to complete the work as described within all associated procurement documents and as shown on the project drawings and indicated within both the Architectural and Electrical drawings and Specifications.All work can be done after hours, or during regular business hours, Monday to Friday. Day work is only permitted if the work is not disruptive to the operation of the building or its occupants. Scaffolding, if used, must be certified, and comply with all applicable safety standards. All electrical work must be certified. The contractor must ensure that access to the building is not obstructed and proper signage in both English and French will be required. Any closures will require a minimum of 2 weeks’ notice for the client.
Documents
Tender Notice