Procurement Summary
Country : USA
Summary : Repair Maintenance (Mtx) Hangar Building 1001 (B1001)
Deadline : 25 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 100116064
Document Ref. No. : W50S6Y24B0002
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : DEPT OF DEFENSE
Contracting Office Address : JACKSONVILLE, FL 32218-7933
Primary Point of Contact : Frederick Cherry
frederick.cherry.1@us.af.mil
Phone Number 9047417405
Secondary Point of Contact : 125th MSC
125MSG.MSC.Contracting@us.af.mil
Phone Number 9047417440
USA
Email :frederick.cherry.1@us.af.mil
Tender Details
Description
***Bid opening been adjusted in SAM to 25 April, at 1030 am, pending Amendment to follow Wed or Thurs this week.
***There was no amendment 004 posted yet, the previous "Q&A set 05" was posted in error (it's part of Q&A 04). There will be a forthcomming ammendment next week to extend the bid opening a week, we had some clarification questions that will be posted once the AE responds along with the Amendment 004 bid extention. Please Check reqularly for updates.
***As a reminder, Contractors wishing to attend the Bid Opening are required to submit a new 125FW Form 2 -5 days prior to base entry for a US citizen and 22 days prior for a foreign national. Contractors must use the current 125FW Form 2 Titled Form 2 Fillable (Aug 2023) - CAO 01MAR2024.
***Amendment 003, is to add adeendum to Specs and Drawings based on Q&A response from A&E, last set of Q&A set 04 and 05, no other changes at this time.
***Post Q&A set 03 for Questons and Answers, no other changes***
***Amendment 002, IS to extend the Bid opening date to 18 April, at 1030EST, this DOES NOT extend the RFI date and 28 March at EOD is last day to accept Q-As, if any questions subitted after that time must be justified by an impact if not responded too. There are additional Q-As that will be posted along with A-E addendum darwing's this week.
***Attaching Pre-Bid Slides, Pre-Bid sign in and Pre-Bid Minutes from 20 March meeting, no other chnages***
***Post Q&A set 02 for Questons and Answers, there will be revised drawings coming from AE per Q2&5, no other changes***
***Post Q&A set 01 for Questons and Answers, no other changes***
***Updated Base Access form revised 1Mar24 added to attachements***
***Amendment 001, is to change bid aceptance from 60 days to 100 Days, Also attaching Revised Drawings and Spec's from A&E dated 04 March 2024. No other changes.***
Project # / Title: LSGA212001, F-35 Repair Hangar Bldg. B1001
You are invited ...
Active Contract Opportunity Notice ID W50S6Y24B0002 Related Notice W50S6Y24B0002 Department/Ind. Agency DEPT OF DEFENSE Sub-tier DEPT OF THE ARMY Major Command NGB Office W7M2 USPFO ACTIVITY FLANG 125
General Information
Contract Opportunity Type: Solicitation (Updated)
All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
Updated Published Date: Apr 16, 2024 09:56 am EDT
Original Published Date: Mar 01, 2024 07:54 am EST
Updated Date Offers Due: Apr 25, 2024 10:30 am EDT
Original Date Offers Due: Apr 04, 2024 10:30 am EDT
Inactive Policy: 15 days after date offers due
Updated Inactive Date: May 10, 2024
Original Inactive Date: Apr 19, 2024
Initiative: None
Classification
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
Product Service Code: Y1EB - CONSTRUCTION OF MAINTENANCE BUILDINGS
NAICS Code: 236220 - Commercial and Institutional Building Construction
Place of Performance: Jacksonville, FL 32218 USA
Documents
Tender Notice
W50S6Y24B0002_00003-Repair-MTX_3Apr24.pdf
Set-05_Q-A_W50S6Y24B0002-Hanger.pdf
Set-04_Q-A_W50S6Y24B0002-Hanger.pdf
Notifier-Panel-Pics.pdf
Rev-2-Attach-1_22-00-00-Specs.pdf
Rev-2-Attach-2-A.-CD100-Adend-2-signed.pdf
Rev-2-Attach-2-B.-CU100-Adend-2-signed.pdf
Rev-2-Attach-2-C.-CS402-ADEND2-signed.pdf
Rev-2-Attach-2-D.-CS403-Adend-2-signed.pdf
Rev-2-Attach-2-E-M.-STRC-Adend-2.pdf
Rev-2-Attach-2-II.-TY-101-ADEND-2.pdf
Rev-2-Attach-2-N-T.-ARCH-amp-Interiors-Adend-2.pdf
Rev-2-Attach-2-U.-P-110B-Adend-2.pdf
Rev-2-Attach-2-V-HH.-ELEC-Adend-2.pdf
Set-03_Q-A_W50S6Y24B0002-Hanger.pdf
W50S6Y24B0002_00002-Repair-MTX_28Mar24.pdf
Hanger-Pre-Proposal-minutes.pdf
Site-Visit-Sign-In-Sheet-20MAR24.pdf
MTX-Pre-Bid-slides-B1001.pptx
Set-02_Q-A_W50S6Y24B0002-Hanger.pdf
Addendum-01_Q-A_W50S6Y24B0002-Hanger.pdf
W50S6Y24B0002_00001-Repair-MTX_5Mar24.pdf
Rev-1-Attach-1-LSGA212001_B1001-Hangar-Combined-Specifications-B-3_3.4.24.pdf
Rev-1-Attach-2-LSGA212001_B1001-Hangar-Combined-Drawings-B-3_3.4.24.pdf
W50S6Y24B0002-Repair-MTX_29FEB24.pdf
Attach-3-JA-BN-LSGA212001-A-Best-Locks_Cores-Redact.pdf
Attach-4-JA-SS-LSGA212001-B-Advantor_Redacted.pdf
Attach-5-JA-BN-LSGA212001-C-Monaco-Redact.pdf
Attach-6-JA-BN-LSGA212001-D-JCI-Metasys-Redact.pdf
Attach-7-125FW-Form-2-Fillable-Aug-2023--CAO-01MAR2024.pdf