Procurement Summary
Country : Switzerland
Summary : Repair of the Auguet Bridge and the Upper Water Side on the Side of Muri. Overall Planning with Overall Management and Specialist Planning for the Sia 31 - 33 Phases and Optional for Phases 41 - 53. a ...
Deadline : 27 Feb 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 95063995
Document Ref. No. : 1389265
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : INHABITANT BELP, PLANNING AND INFRASTRUCTURE DEPARTMENT
Contact Name: Belp residents, Planning and Infrastructure Creation Center/Organizer: Inhabitant community Belp, Department of Planning and Infrastructure, to HDN. By André Bürki, Güterstrasse 13, 3123 Belp, Switzerland, phone: 031 818 22 40
Switzerland
Email :bauabteilung@belp.ch
Tender Details
Repair of the Auguet Bridge and the upper water side on the side of Muri. Overall planning with overall management and specialist planning for the SIA 31 - 33 phases and optional for phases 41 - 53. Condition analyzes of the superstructure and the foundation in 2020 and 2021 have shown that local damage to the superstructure is available and that the piles of the foundation created in 1973 will lose their cross -section. An repair must therefore be provided. The bank is to be repaired on the top of the water side. The execution should be carried out together with the renovation of the bridge if there are synergies. Total planning with overall management and specialist planning for the SIA 31 - 33 phases and optional for phases 41 - 53.
Demand/awarding authority: Belp, Department of Planning and Infrastructure Creation Center/Organizer: Inhabitants Belp, Department of Planning and Infrastructure, to HDN. by André Bürki, Güterstrasse 13, 3123 Belp, Switzerland, phone: 031 818 22 40, email: bauabdivt@belp.ch
Publish Date: 11.01.2024
Procurement object
2.1 Service category CPC :: [12] Architecture; Technical advice and planning and integrated technical services; City and landscape planning; associated scientific and technical advice
2.2 Project title of procurement: repair of the Auguet Bridge and the upper water side on the Muri page. Overall planning with overall management and specialist planning for the SIA 31 - 33 phases and optional for phases 41 - 53.
2.4 Division in lots?: No
2.5 Community vocabulary:
2.6 The subject and scope of the order: Condition analyzes of the superstructure and the foundation in 2020 and 2021 have shown that there are local damage to the superstructure and the piles of the foundation created in 1973 have lost cross -section. continue to lose cross -section. An repair must therefore be provided. The bank is to be repaired on the top of the water side. The execution should be carried out together with the renovation of the bridge if there are synergies. Overall planning with overall management and specialist planning for the SIA 31 - 33 phases and optional for phases 4 ...
Documents
Tender Notice