Procurement Summary
Country : USA
Summary : Repair and Construct Primary Electric Distribution
Deadline : 12 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 97539271
Document Ref. No. : FA4877
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : DEPT OF DEFENSE
Contracting Office Address : DAVIS MONTHAN AFB, AZ 85707-3522
Primary Point of Contact : Joshua E. Rodriguez
joshua.rodriguez.30@us.af.mil
Phone Number 520-228-4838
Secondary Point of Contact : Joshua A Drawdy
joshua.drawdy.2@us.af.mil
Phone Number 5202285612
USA
Email :joshua.rodriguez.30@us.af.mil
Tender Details
Description
THIS SYNOPSIS IS NOT A SOURCES SOUGHT NOTICE; DO NOT CONTACT THE CONTRACTING OFFICE TO PROVIDE CAPABILITIES STATEMENTS OR NOTICE OF INTEREST.
Department of the Air Force, Air Combat Command, 355th Contracting Squadron, will solicit for a Firm Fixed Price contract at Davis-Monthan (DM) Air Force Base (AFB), Tucson, Arizona (AZ). The applicable North American Industry Classification System (NAICS) code is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19, 000, 000.00. The project encompasses the design, plans, specifications, and execution of repair, construction, and demolition activities to design and construct the switch house facility on the DMAFB Substation yard (Facility Number 4739). The Contractor will also be responsible for installation and testing of switch house systems, underground conduits, coordination and final testing. A full outline of the work to be performed is included in the project specifications which will be included as an attachment to the solicitation document.
All work shall comply with the current Base Design Compatibility Guidelines (DCG), 355 CS Design Guide, and the Cybersecurity Control Systems Guide (attached). The contractor shall bring all identified facility systems up to current codes, and supervision necessary to complete the aforementioned project at Davis-Monthan AFB, AZ.
IAW FAR 36.204; the project magnitude is between $2, 500, 000 and $5, 000, 000.
AT A MINIMUM, THE FOLLOWING INFORMATION WILL BE REQUIRED:
THIS PROCUREMENT IS A 100% SECTION 8(a) SMALL BUSINESS SET-ASIDE.
The successful contractor shall be selected based on the lowest bid and upon determination by the Contracting Officer that the prospective contractor is responsible IAW FAR 9.1. An initial Pre-Performance conference will be held at DMAFB, Tucson, AZ. We are tentatively scheduling a site visit for 9 AM on 26 March 2024. Please limit site visit attendance to the ...
Active Contract Opportunity Notice ID FA4877 Related Notice Department/Ind. Agency DEPT OF DEFENSE Sub-tier DEPT OF THE AIR FORCE Major Command AIR COMBAT COMMAND Office FA4877 355 CONS PK
General Information
Contract Opportunity Type: Presolicitation (Original)
All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA
Original Published Date: Feb 22, 2024 02:23 pm MST
Original Response Date: Apr 12, 2024 02:00 pm MDT
Inactive Policy: 15 days after response date
Original Inactive Date: Apr 27, 2024
Initiative: None
Classification
Original Set Aside: 8(a) Set-Aside (FAR 19.8)
Product Service Code: Z2PZ - REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors
Place of Performance: Tucson, AZ 85707 USA
Documents
Tender Notice
Synopsis--Electrical-Distribution.pdf
16.-Cybersecurity-of-Facility-Related-Control-Systems-01-18-2017.pdf
15.-355-CS-Base-Design-Guide-2021.pdf
14.-DMAFB-Design-Compatibility-Guidelines-2017.pdf
13.-Contractor-Environmental-Guide-15-May-2019.pdf
12.-DMAFB-Installation-Failure-Action-Plan.docx
11.-E-601-SINGLE-LINE-DIAGRAM.pdf
10.-E-101-E-HOUSE-PLAN.pdf
9.-DMAFB-Electrical-Distribution--Drawing-Set--100-pct.pdf
8.-DMAFB-Electrical-Dist--Design-Analysis--100-percent.pdf
7.-DMAFB-Electrical-Dist--Cx-Plan.pdf
6.-5015-21-3104-DMAFB-Substation-Specs-1.19.2024.pdf
5.-5015-21-3104-DMAFB-Substation-PampC-Report--100.pdf
4.-5015-21-3104-DMAFB-Substation--100-Structural-Calcs.pdf
3.-5015-21-3104-DMAFB-Substation--100-Elec-Calc-Package.pdf
2.-5015-21-3104-DMAFB-Cutsheets--100.pdf
1.-Specifications-Package-FBNV19.pdf