Procurement Summary
Country: France
Summary: Renovation Work on a Natural Environment Discovery Trail
Deadline: 11 Sep 2026
Posting Date: 16 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145254241
Document Ref. No.: 26-70528
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45233260 - Pedestrian ways construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The purpose of the framework agreement is to carry out the necessary rework of the trail, as the need arises. Before construction, the old path must be completely stripped, up to the level of the base and the materials removed must be evacuated to appropriate sites. After compaction of the subgrade, shaping of the foundation layer (on rot-proof geotextile) in all coming 0/31.5 by leveling using light earthworks respecting the future slopes for water flow rainwater, then compaction according to the appropriate Proctor index. Then, the stabilized coating layer with slow pozzolanic setting is implemented in the following manner, and according to the supplier's instructions: humidification of the foundation layer if necessary. The preparation of the coating mixture will consist of crushed sand, with a dosage estimated at 6 to 8% of the hyper-pozzolanic binder, all mixed under humidity adjusted to the water content W% of the OPN (Proctor) of the sand, according to the indications. of the supplier. Supply and spreading of the mixture for creating the surface coating. Adjustments for the rainwater flow slopes which will go towards the Adour, then compaction by stopping when we notice too much rise of humidity or just before the appearance of puff pastry The path is made up of the following structure: 12 cm of GNT 0/31.5 limestone 6 cm of STABEX sand or equivalent The market will be a framework agreement without min...
Documents
Tender Notice