Procurement Summary
Country: Poland
Summary: Renovation of the Electrical Installation at Primary School No. 1 - Wing A, 1St Floor, Ul. Dworcowa 2
Deadline: 01 Jun 2026
Posting Date: 16 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141403336
Document Ref. No.: 2026/BZP 00246133/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45310000 - Electrical installation work
45311000 - Electrical wiring and fitting work
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45315600 - Low-voltage installation work
45315700 - Switching station installation work
45317000 - Other electrical installation work
31524000 - Ceiling or wall light fittings
31524100 - Ceiling light fittings
31524120 - Ceiling lights
31500000 - Lighting equipment and electric lamps
31518200 - Emergency lighting equipment
45324000 - Plasterboard works
45400000 - Building completion work
45410000 - Plastering work
45442100 - Painting work
45000000 - Construction work
45262690 - Refurbishment of run-down buildings
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Renovation of the electrical installation at Primary School No. 1 in Gubczyce, wing A, 1st floor, ul. Dworcowa 2. The scope of the order includes: 1) Construction of the electrical installation of 230V plug sockets for general purposes. 2) Construction of the installation electrical power.3) Construction of a lighting installation with LED lamps.4) Assembly of low-voltage electrical switchboards.5) Construction of a bell installation.6) Construction of a sound system.7) Construction of a telecommunications installation.8) Construction of an installation grounding and main and local equipotential connections.9) Carrying out control measurements of the installation and lighting.10) Preparing as-built documentation. 11) Carrying out construction works, i.e. building plasterboards in order to carry out installations electrical and structural, execution of passages through substrings in order to lead the electrical instance; painting the rooms, etc. The scope of the entire project at this stage of the task implementation is: - in part of the first floor defined by the wing BThe detailed scope of the order, the description required by the ordering party in terms of implementation and acceptance, specify: - design documentation where the element...
Documents
Tender Notice