Procurement Summary
Country: Ukraine
Summary: Reconstruction of the Plant Management Building into an Administrative Building with an Extension and Superstructure.
Deadline: 28 Oct 2025
Posting Date: 21 Oct 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 128596868
Document Ref. No.: UA-2025-10-20-9585280
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45210000 - Building construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
TECHNICAL TASK FOR THE PERFORMANCE OF CONSTRUCTION AND ASSEMBLY WORKS Object: Address: Cherkasy, ave. CHERKASARKHPROEKT LLC Class of consequences: CC11. floors (including the superstructure), total area ≈2775 m2, volume 9898.6 m³.- The facade is insulated, with decorative decoration and stained-glass windows.- The roof is flat, operated.- The project provides for the completion of the elevator shaft and the addition of the fourth floor. 1.1 The contractor must submit a proposal for the execution of no the entire set of works according to the project, but only what is specified in this technical specification.2. dismantling works - Dismantling of the existing roof. - Dismantling of all superstructures on the 3rd floor up to the design mark. - Dismantling of floor slabs above the staircase marching 3rd floor.- Dismantling of the existing external landscaping around the building in the places of earthworks.- Dismantling of the old concrete stairs of the central entrance. 2.2. and concrete foundations, backfilling with tamping. 2.3. elevator shaft (foundation, walls, floor, waterproofing, embedded parts).- Fourth floor superstructure (frame, walls, floor, roofing).- Installation of a metal canopy over the main entrance. 3. all work in accordance with the current DBN and DSTU.- Use only certified equipment, machinery, tools.- Guarantee for the work performed — Not less than 3 years, after completion and handover of works.- When submitting a commercial offer, the contractor must take into account all necessary equipment (excavators, cranes, hoists, concrete mixers, welder...
Name of material/service: Reconstruction of the plant management building into an administrative building with additions and superstructure.
Documents
Tender Notice