Procurement Summary
Country: Slovakia
Summary: Reconstruction of Culvert No. P29800 on Road Iii/1951 in Horná Breznica
Deadline: 22 Jul 2026
Posting Date: 10 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144881849
Document Ref. No.: 478356-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 51481.34
CPV Classification
45000000 - Construction work
45233140 - Roadworks
45232450 - Drainage construction works
45233142 - Road-repair works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Reconstruction of culvert no. P29800 on road III/1951 in Horná Breznica The subject of the contract is the reconstruction of culvert no. P29800 on road III/1951 in Horná Breznica in accordance with the measurement report, project documentation and draft contract, which form the annexes of these competition documents. The proposed culvert is made of concrete pipes with a minimum permissible vertical peak load of 100 kN/bm DN 800 mm in a longitudinal slope of 6%. For the culvert itself, concrete neck pipes are used with a length of 3.0 m - 1 piece, 2.5 m - 2 pieces and 2 m - 2 pcs. The outermost 3-meter and 2-meter pipes are adapted to the shape of the inlet and outlet objects. The pipes will be placed in the trench on concrete sleepers, which should be part of the delivery of the pipes. After laying the pipes, the lower part of the pipes is concreted to a height of 400 mm with C12/15 concrete. The bed must be divided by expansion joints, which are placed under the pipe joints at distances of max. 6.00 m. The inlet object is designed as a sludge pit with internal floor plan dimensions of 1.0*2.3 m and a height of 3.15 m. The thickness of the board and walls is 300 mm. The sludge pit is from reinforced concrete C30/37 - CX4, XF4 (Sk) - Cl0.4 Dmax 22 (STN EN 206-1). At the bottom of the sludge pit, there is a 200 mm thick quarry stone pavement with M2.5 cement mortar grouting into 100 mm thick C12/15 concrete. The inflow into the pit is on both sides from the road ditch and the third the inflow is from a DN 400 plastic pipe, which is led from the space above the road. The walls at the inlet from the ditches will be adjusted to the shape of the ditches. The ditches in front of the inlet on both sides should be strengthened at least along the length...
Document Type: Contract Notice Contract Type: works Estimated Value: 51481.34 - EUR Authority Type: body-pl-ra Doc Title: Reconstruction of culvert no. P29800 on road III/1951 in Horná Breznica Dispatch Date: 2026-07-09 Publish Date: 2026-07-10 Submission Date: 2026-07-22
Documents
Tender Notice