Procurement Summary
Country: Czech Republic
Summary: Reconstruction of the Castle Terrace, Stairs and Railings in Klášterec Nad Ohří
Deadline: 02 Jul 2026
Posting Date: 19 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143589357
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the contract is the reconstruction of the castle terrace, staircase and railing in Klášterec nad Ohří. The viewing terrace of the chateau consists of a paved area of sandstone strips laid in dividing squares filled with terracotta "honeycomb" paving. The railings are made of massive sandstone posts with stilts, metal filling and cover handle. The access staircase has 16 sandstone steps and the stair railing is identical to the balustrade of the terrace. All parts and surfaces of stone structures will require restoration work and overall conservation carried out by a professionally qualified person according to the conditions of the binding opinion of the NPO. The statically damaged supporting slab of the staircase will have to be demolished incl. the starting base of the staircase. Sandstone stair treads will be after a thorough survey and signs dismantled and, after restoration, placed back on a new monolithic reinforced concrete inclined slab. The paving will be dismantled on the terrace of the castle, incl. the original composition of the terrace down to the supporting structure of the floor. Waterproofing will be carried out on a cleaned substrate, subsequently a separation geotextile will be laid and a new paving respecting the original shape and material solution will be laid on top of it in the aggregate layer. Drainage elements, terrace plating and angular gutters and downspouts will also be changed. Staircase and balustrade railing will be restored according to the prepared restoration entrance survey and the described cleaning, repair and conservation procedures. Furthermore, the conditions of issued decisions and binding opinions will be respected. Part of the contractor's delivery is in addition to the work listed in the statement measurement and the provision of the following activities: * construction of the work according to the statement of measurements, in accordance with valid permits, according to applicable standards and regulati...
Documents
Tender Notice