Procurement Summary
Country: Poland
Summary: Reconstruction of Buildings 4, 5 and 7 of the Recreation Center in Arturówek
Deadline: 20 Apr 2026
Posting Date: 04 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138990297
Document Ref. No.: MOZ.OZP.2510.14.2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
1. The subject of the order is the reconstruction of buildings 4, 5 and 7 of the tourist and recreation center in Arturówek, along with changing the use of building no. 7 into a reception building with sanitary facilities.2. The scope of the order includes: 1) reconstruction of buildings in based on the existing design documentation and construction permit, 2) removal from the renovated buildings and disposal of all movable property contained in them, 3) performance of design work in the scope of preparation necessary for the implementation of the investment workshop and technological designs and the preparation of replacement drawings in relation to the documentation provided by the Ordering Party, in the event that the Contractor applies for the introduction of replacement solutions; 4) delivery of devices related to subject of the order and their assembly and commissioning in accordance with the OPZ; 5) coordinating its work with the work of other contractors on the premises of the Ordering Party 6) carrying out all necessary acceptance procedures after the completion of the works and works and obtaining the necessary permits, approvals and notifications allowing the Ordering Party to use the facility, including the spaces included in the subject of the order, to prepare as-built documentation in the form and scope consistent with the contract;7) air-conditioning devices: use devices enabling the temperature inside the rooms to be set at least in the range of 19°C-23°C, heating efficiency (COP) min. 4.5 (which means at least 4.5 kW of thermal power from 1 kW of electrical power) and cooling efficiency ...
Documents
Tender Notice