Procurement Summary
Country: Slovakia
Summary: Realization of the Construction "The Sealing of the 400 Kv Line to the Vajnory Electrical Power Station" Description: the Subject of the Contract is the Construction of the Work: "The 400 Kv Line Sealing to the Vajnory Electrical Power Station", w...
Deadline: 11 May 2026
Posting Date: 08 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140903680
Document Ref. No.: 6406 - DOP
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 1317
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Realization of the construction "The sealing of the 400 kV line to the Vajnory electrical power station" Description: The subject of the contract is the construction of the work: "The 400 kV line sealing to the Vajnory electrical power station", which consists of 4 separate buildings. The subject of the performance is to ensure the sealing of the newly created 400 kV line (V430 and V499) to the newly built 400/110 kV ESt Vajnory. The newly created 400 kV lines, which need to be connected to the new ESt Vajnora, will be created by cutting the V8499 line, which is currently operated at a voltage level of 110 kV. Mouthing of the newly created 400 kV line, in addition to work in the Vajnory substation area, there is also work on the connection of the other side of the 400 kV line (in the Stupava and P. Biskupice substation areas) and the modification of the 400 kV line in the area of k.u. Patov. Besides construction and assembly works are also the subject of the order, related activities and the preparation of workshop documentation and documentation of the actual execution of the construction (DSV) according to the prepared documentation for the selection of the construction contractor in the structure of the construction implementation project "Zaustenie 400 kV line to ESt Vajnory" or according to the updated documentation in the structure of the implementation project. In the case of using the equivalent, the cost of developing updated documentation in the structure of the implementation project will be included in the price of the work and in accordance with the currently valid normative requirements, the contractor is obliged to ensure during its processing also geodetic orientation, processing of the actual longitudinal and transverse profile of all sections of the 400 kV line affected by the construction (conductors, KZL, ZL), calculation of the permitted current load up to 80 C, calculation of critical points, as well as in the case of the design of the equiva...
Predpokladaná hodnota : "Open Sans", sans-serif; font-size: 13px; line-height: 17px; } ul.notice-list li::before { content: unset !important; color: transparent; display: inline-block; width: unset; } ul.notice-list { list-style: none; margin-top: unset; margin-bottom: unset; padding-bottom: 10px; padding-left: 15px; } .list-title { margin-bottom: unset; border: none; font-size: 14px; color: #6495d5; font-weight: bold; padding-left: 0; padding-top: 12px; } .list-sub-title { color: black; font-weight: bold; padding-top: 12px; } /*#output-container ul:first-of-type { padding-bottom: 50px; }*/ .title { margin-bottom: 5px; } .id { padding-bottom: 30px; } #output-container { padding-bottom: 30px; } Notification of changes to the contract and framework agreement ÚVO identifier: 14003601. Basic data Organization: Slovenská elektrizačná prenosová sústava, a.s. (ID: 82047)
Documents
Tender Notice