Procurement Summary
Country: Netherlands
Summary: Realization of a Civil Engineering Structure for a Process Installation (co2 Capture Plant) at Hvc Alkmaar
Deadline: 04 Nov 2026
Posting Date: 17 Sep 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 149293964
Document Ref. No.: 642107-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 5000000
CPV Classification
45220000 - Engineering works and construction works
45223500 - Reinforced-concrete structures
45262210 - Foundation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Realization of a civil engineering structure for a process installation (CO2 capture plant) at HVC Alkmaar
HVC has set itself the goal of emitting one million tons of CO2 less in 2035 than in 2025. The aim is to achieve this, among other things, by developing a CO2 capture installation at the HVC location in Alkmaar. The aim of this installation is to capture 100 kilotons of CO2 and sell the captured CO2 (CCU). For comparison: this corresponds to the average CO2 emissions from the energy consumption of 30, 816 households. In 2024, HVC concluded a contract with supplier SLB Capturi | after a tender procedure SLB Capturi (SLBC) for the construction of a CO2 capture installation at the HVC location in Alkmaar. Over the past period, HVC has been working with SLBC on a FEED (front-end engineering design). The FEED will be ready in June 2026. Supplier SLBC of the capture installation has excluded the civil works and the Balance of plant from its delivery. These must be provided by HVC itself. To this end, HVC has taken the initiative for three purchasing projects: • Engineering Preparation for Construction and Civil (Engineering) • Preparation for Construction (BMR) • Civil Engineering Construction (C...
Document Type: Contract Notice
Reference Number: 104ceabc-dbe8-48e9-9fba-a18ac12c604f
Contract Type: works
Estimated Value: 5000000 - EUR
Authority Type: body-pl
Doc Title: Realization of civil engineering construction for process installation (CO2 capture plant) at HVC Alkmaar
Dispatch Date: 2026-09-16
Publish Date: 2026-09-17
Submission Date: 2026-11-04
Documents
Tender Notice