Procurement Summary
Country: Poland
Summary: Rationalization of Energy Consumption in Public Buildings - Thermal Modernization and Installation of a Pv Installation on the Premises of Primary School No. 30. Rtm. Witold Pilecki at Ul. Drawing...
Deadline: 06 May 2026
Posting Date: 07 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139102747
Document Ref. No.: 235934-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45311200 - Electrical fitting work
09331200 - Solar photovoltaic modules
09332000 - Solar installation
45300000 - Building installation work
45311100 - Electrical wiring work
45315600 - Low-voltage installation work
45315300 - Electricity supply installations
45315100 - Electrical engineering installation works
45320000 - Insulation work
45321000 - Thermal insulation work
45331100 - Central-heating installation work
45453000 - Overhaul and refurbishment work
45310000 - Electrical installation work
45312310 - Lightning-protection works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Rationalization of energy consumption in public buildings - thermal modernization and installation of a PV installation on the premises of Primary School No. 30. Rtm. Witold Pilecki at ul. Drawing... (Numbering according to SWZ): 4.1 The subject of the order is Rationalization of energy consumption in public buildings - thermal modernization and installation of a PV installation on the premises of Primary School No. 30. Rtm. Witold Pilecki at ul. Rysownica 1/3 in Łódź as part of the funding obtained from the Voivodeship Fund for Environmental Protection and Water Management in under the "Rationalization of energy consumption in public buildings and municipal resources - 2025 edition" program The subject of the order includes two additional items. tasks: 1) Task I) General scope of work to be performed as part of the installation of the PV installation: - Stage 1 - including the development of documentation - Stage 2 - including the execution of construction works based on the prepared documentation mentioned in Stage 1 2) Task II) General scope of work to be performed as part of the thermal modernization of the building 4.2Szczegółowy opis przedmiotu the order is included in Annex No. 1 to the SWZ and in the contract template in Annex No. 6a and Annex 6b to the SWZ 6. ORDER COMPLETION DEADLINE Order completion date: 180 days from the date of signing the contract (date of completion of the subject of the contract depending on the Contractor's offer - the offer evaluation criterion is 180 days, this is the maximum deadline for completing the item) including: - Task 1) PV installation Stage 1: up to 100 days from the date of signing the contract, Stage 2: starting from the date of the protocol handover of the area construction. Completion within 180 days from the date of signing the contract - Task 2) thermal modernization 180 days from the date of signing the contract 24.1.The contractor whose offer...
Document Type: Contract Notice Reference Number: DOM-WZP-II.271.34.2026 Contract Type: works Authority Type: la Doc Title: Rationalization of energy consumption in public buildings - thermal modernization and installation of a PV installation on the school premises Primary No. 30 named after Rtm. Witold Pilecki at ul. Rysownica 1/3 in Łódź Dispatch Date: 2026-04-03 Publish Date: 2026-04-07 Submission Date: 2026-05-06
Documents
Tender Notice