Procurement Summary
Country: USA
Summary: Ram Replacement, Installation, and Disposal
Deadline: 24 Sep 2026
Posting Date: 18 Sep 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 149362548
Document Ref. No.: PZZG0917
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Description(s): EDWARDS AFB SOURCES SOUGHT FOR B1030 RADAR ABSORBING MATERIAL (RAM) REPLACEMENT, INSTALLATION, AND DISPOSAL
THIS IS A MARKET SURVEY FOR INFORMATION ONLY. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPISIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW-UP INFORMATION REQUESTS. THE PURPOSE OF THIS SYNOPSIS IS TO GAIN KNOWLEDGE OF POTENTIALLY QUALIFIED SOURCES AND THEIR SIZE CLASSIFICATIONS (SMALL BUSINESS, LARGE BUSINESS, ETC.). PLEASE DO NOT REQUEST A COPY OF A SOLICITATION, AS ONE DOES NOT EXIST.
1. Purpose.
The United States Air Force is conducting market research to identify capable sources for the procurement of high-performance, medium-power (MP) Radar Absorbing Material (RAM) in four distinct physical configurations, along with professional installation services (including surface preparation and precision mounting) and certified, environmentally compliant disposal services for decommissioned legacy RAM at the Benefield Anechoic Facility (BAF), Edwards Air Force Base (AFB), California. This comprehensive solution will upgrade electromagnetic energy absorption capabilities to accommodate higher-power Systems Under Test (SUT) without experiencing thermal or electromagnetic performance degradation. The resulting contract will be a 5-Year IDIQ.
2. Requirement.
The 772d Test Squadron (TS) at Edwards AFB, CA, has an operational requirement to replace and test medium-power Radar Absorbing Material (RAM) within the Benefield Anechoic Facility (BAF). The overall objective of the RAM is to eliminate multi-path RF reflections back to the System Under Test (SUT).
To accommodate advanced, high-power systems, the replacement RAM must offer increased power handling performance without suffering frequency-response degradation. To achieve this, the RAM must consist of open-cell foam with proportionally consistent pore sizes...
Documents
Tender Notice
Documents.zip