Procurement Summary
Country: Canada
Summary: Quittenton Hall Rtu Replacements - Phase 1 and Phase 2
Deadline: 29 Jun 2026
Posting Date: 04 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142613368
Document Ref. No.: 2027-006
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Purchaser is seeking Proposals from qualified and experienced Proponents to complete work for the replacement of Roof Top Units (RTUs) at the St. Clair College Student Residence - Quittenton Hall, located at 3995 Geraedts Dr., Windsor, Ontario N9G 3C3. This student residence is situated on the St. Clair College South Windsor Campus at 2000 Talbot Rd. West, Windsor, ON N9A 6S3. The RTU replacement will be completed as part of a two-phase project.The scope of work includes:Base Proposal - Phase 1Replacement of two (2) RTUs, MUA-1, MUA-2, along with associated exhaust fans EF-6, EF-7, EF-8, EF-9, EF-10, EF-11, and EF-17. Optional Proposal - Phase 1 and Phase 2Replacement of four (4) RTUs, MUA-1, MUA-2, MUA-3, and MUA-4, along with associated exhaust fans EF-1 through EF-19.The scope of work includes but is not limited to the following: Coordinate crane location and timing with the Purchaser to ensure lifting operation does not conflict with the Purchaser-s operations. Remove existing make-up air units, disconnect and secure existing gas piping, power and controls wiring. Expose roof areas to enable installation of new roof curbs for make-up air units. The Preferred Proponent is to ensure work is completed without risking water penetrating inside the building. Remove existing exhaust fans where shown on drawings. Replace exhaust fans as noted. Connect fresh air supply ducts from new make-up air units to existing supply air risers. Reconnect gas piping and power to new make-up...
Reference Number : 0000323881 Location : Canada, Ontario, Windsor-Sarnia Purchase Type : One Time Only- Delivery Date:2027/03/31 Description : The Purchaser is seeking Proposals from qualified and experienced Proponents to complete work for the replacement of Roof Top Units (RTUs) at the St. Clair College Student Residence - Quittenton Hall, located at 3995 Geraedts Dr., Windsor, Ontario N9G 3C3. This student residence is situated on the St. Clair College South Windsor Campus at 2000 Talbot Rd. West, Windsor, ON N9A 6S3. The RTU replacement will be completed as part of a two-phase project.The scope of work includes:Base Proposal - Phase 1Replacement of two (2) RTUs, MUA-1, MUA-2, along with associated exhaust fans EF-6, EF-7, EF-8, EF-9, EF-10, EF-11, and EF-17. Optional Proposal - Phase 1 and Phase 2Replacement of four (4) RTUs, MUA-1, MUA-2, MUA-3, and MUA-4, along with associated exhaust fans EF-1 through EF-19.The scope of work includes but is not limited to the following: Coordinate crane location and timing with the Purchaser to ensure lifting operation does not conflict with the Purchaser’s operations. Remove existing make-up air units, disconnect and secure existing gas piping, power and controls wiring. Expose roof areas to enable installation of new roof curbs for make-up air units. The Preferred Proponent is to ensure work is completed without risking water penetrating inside the building. Remove existing exhaust fans where shown on drawings. Replace ...
Documents
Tender Notice