Procurement Summary
Country: Poland
Summary: Purchase of Emission-Free Rolling Stock with Power Supply Infrastructure and Technical Facilities for Public Extra-Urban Transport - Technical Facilities
Deadline: 21 Aug 2026
Posting Date: 08 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146830894
Document Ref. No.: 2026/BZP 00379870/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
71320000 - Engineering design services
71221000 - Architectural services for buildings
45111200 - Site preparation and clearance work
44112100 - Shelters
45223220 - Structural shell work
45223210 - Structural steelworks
45223800 - Assembly and erection of prefabricated structures
45233250 - Surfacing work except for roads
45310000 - Electrical installation work
09331200 - Solar photovoltaic modules
09332000 - Solar installation
45261215 - Solar panel roof-covering work
45311100 - Electrical wiring work
45312310 - Lightning-protection works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Purchase of emission-free rolling stock along with power supply infrastructure and technical support for public extra-urban transport. Technical support. Execution in the design and build formula, design documentation and construction works in accordance with the Program Functional and Utility Fund, hereinafter referred to as PFU, constituting Annex No. 9 to the SWZ and consisting in the preparation of design documentation (design, obtaining legally required decisions and construction permits) and implementation of construction works. As part of this order, all studies must be prepared that may be necessary for the design, construction and use of the subject of the order. All studies should be prepared in a number of copies enabling obtaining all necessary agreements and permits. plus, in addition, always 2 copies for the Ordering Party. a) Design documentation. The documentation part should: - develop (if required) an assessment of the investment's impact on the environment; - develop situational and elevation maps for the purposes of design;- developed architectural and construction designs in all necessary industries along with all required arrangements...
Documents
Tender Notice