Procurement Summary
Country: Canada
Summary: Project: Tender_21744 - Stoplog Replacement and Dewatering Project
Deadline: 28 Aug 2026
Posting Date: 25 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143980195
Document Ref. No.: tender_21744
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Contractor will design, supply, and manage a temporary flow control system to support stoplog replacement at five dams. A Professional Engineer must prepare sealed shop drawings following site visits to confirm field conditions. The Contractor will install, maintain, move, and remove the system as work progresses, protect all existing structures, and repair any damage caused. Scope of Work The Contractor is responsible for providing, installing, maintaining, relocating, and removing a temporary flow management system to control water through sluiceways during stoplog replacement at five dams. The system may include bulkheads, floating bulkheads, or other contractor designed solutions, subject to approval by the Ministry of Natural Resources (MNR). The Contractor must prepare sealed engineering shop drawings following site visits to verify field conditions and required measurements. Work includes protecting existing structures and salvaged materials, preventing sediment or contaminants from entering waterways, and supplying/maintaining construction signage on access roads. Underwater divers are to be employed if required. All work must occur between July 16 and August 31, 2026 to comply with in water work restrictions. MNR reserves the right to modify the scope of work
Solicitation Type : RFB - Request for Bid (Formal) Reference Number : 00005097484 Location : Ontario Purchase Type : Not Stated Dates Publication : 2026/06/24 08:11:00 AM EDT Closing Date : 2026/08/28 11:00:00 AM EDT Contact Information : Chinmay Dalwadi : [email protected] : Description : The Contractor will design, supply, and manage a temporary flow control system to support stoplog replacement at five dams. A Professional Engineer must prepare sealed shop drawings following site visits to confirm field conditions. The Contractor will install, maintain, move, and remove the system as work progresses, protect all existing structures, and repair any damage caused. Scope of Work The Contractor is responsible for providing, installing, maintaining, relocating, and removing a temporary flow management system to control water through sluiceways during stoplog replacement at five dams. The system may include bulkheads, floating bulkheads, or other contractor designed solutions, subject to approval by the Ministry of Natural Resources (MNR). The Contractor must prepare sealed engineering shop drawings following site visits to verify field conditions and required measurements. Work includes protecting existing structures and salvaged materials, preventing sediment or contaminants from entering waterways, and supplying/maintaining construction signage on access roads. Underwater divers are to be employed if required. All wor...
Documents
Tender Notice