Procurement Summary
Country: USA
Summary: Professional Engineering Services for Lift Station 2 - Design & Permitting
Deadline: 03 Aug 2026
Posting Date: 01 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144347157
Document Ref. No.: 26-ITB-008
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The City of South Daytona, FL is soliciting bids for Project Title. Sealed paper bids will be accepted in the City Manager-s Office, City Hall, located at 1672 S. Ridgewood Avenue, South Daytona, Florida 32119. Bids may be submitted electronically via the Citys e-Procurement Portal at https://procurement.opengov.com/portal/southdaytona. Bids will be accepted until Response Submission Time on Response Submission Date.Project work includes professional engineering services for the evaluation, engineering, and preparation of construction documents for the resiliency upgrades to Lift Station #2 in support of Hazard Mitigation Grant Program (HMGP) objectives. The Consultant shall assess existing site conditions, structural components, mechanical and electrical systems, and hydraulic capacity, and develop design solutions to elevate the lift station-s lowest finished floor and all critical electrical and control components to a minimum of two (2) feet above the applicable Base Flood Elevation. The design shall include the replacement of the existing 60-kW generator, originally installed in 1989, with a new 75-kW permanent generator, or other appropriately sized unit as determined through engineering analysis and coordination with equipment vendors to ensure adequate capacity for continuous operation of critical infrastructure. The Consultant shall also design the installation of submersible pumps equipped with watertight seals and any associated mechanical, structural, and electrical modifications required for full system integration.Design services shall incorporate flood and wind resiliency measures consistent with a 500-year storm event, including compliance with National Flood Insurance Program (NFIP) requirements and wind load criteria in accordance with ASCE 7. The Consultant shall evaluate and identify a suitable generator location, whether elevated or relocated outside the Special Flood Hazard Area (SFHA), ensuring adequate space for operation, maintenance, and...
Documents
Tender Notice