Procurement Summary
Country: Philippines
Summary: PROCUREMENT OF ICT INFRASTRUCTURE: DATA CENTER & NETWORK UPGRADING PROJECT
Deadline: 23 Mar 2018
Posting Date: 05 Mar 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 21169390
Document Ref. No.: GF-PB-18-09
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
30200000 - Computer equipment and supplies
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
PROCUREMENT OF ICT INFRASTRUCTURE: DATA CENTER & NETWORK UPGRADING PROJECT
ONE (1) LOT ICT INFRASTRUCTURE: DATA CENTER & NETWROK UPGRADING
1. Environmental Monitoring System
2. Room Alert 12 ER - Monitor w/PoE ("1U 19")
3. Sensor: Digital Temperature & Humidity UPGRADE from Temp 25`
4. Power Sensor
5. Sensor: Flood SENSOR w/ 8` Flood Cable
6. Light Tower w/ Audio
7. Annual Service Subscription (Cloud Monitoring)
8. Smoke sensor with escape light guide
9. Din Rail and Power Supply plus wiring for Room Alert
10. Cat5e UTP Cable, Blue (100m)
11. Installation and configuration
12. Data Cabinet
13. Rapid Data Rack Cabinet 800*1000*2072mm, high-density vented doors, includes 2 Vertical Cable Managers, 1 vertical PDU, 42U with 4 unit cooling fan for rack cabinet and top cover
14. Biometric Door Access Control
15. PoE Fingerprint /RFID Access Control
16. Lock Set: 600lbs. Magnetic door lock, LNZ Brackets/ Ubracket, Exit Push Button Switch (plastic type), Emergency Keyswitch, Access Control Power Supply, Back Up Battery, Fire Rated Glass door for Datacenter.
17. Engineering Services (labor, delivery, installation, roughing-ins, contingency etc.)
18. 5KVA 3U Rack mount UPS
19. 5KVA R/T, 3U with rack mounting Kit
Capacity (VA/Watts): 5000/4500
Input Connection: Hardwired
Output Connection: Hardwired
20. On-line double conversion with PFC
(Power Factor Correction) system
21. Rack/Tower Configuration
22. Input Voltage Range: 176-276V without
derating (up to 100-276V with derating)
23. Output Voltages: 200/208/220/230/240/250V +/- 1%
24. Network Card-MS
25. External Battery Module (EBM) 3U, 240V
with rack mounting kit
26. Frequency: 50/60 Hz auto-selection
27. FLEXPDU BASIC 0U (309 16A 1P)20XC13:4XC19
28. REV42612PB - RE Series Server Enclosure,
Premier, 42U, 600W x 1170D, 1500kg, Black,
Assembled
29. Warranty : 2 years
30. Delivery, Installation & Configuration
31. Power Distribution Unit
32. ePDU, Basic, OU, 16A, IEC309 Input, 20 x C13, 4 x C19 0
33. Patch Panel & Cable Manager
34. Cat6 24 port patch panel (unshielded, loaded, easy installation)
35. Steel horizon cable manager
36. Fire Suppression
37. HCA-4/ 230V 4 Zone Convection FACP 220V Red
38. 24 VDC, photoelectric smoke detector head (no reed switch)
39. 2 wire, 6` detector base, 24 VDC*
40. Wall mount horn/strobe, 24VDC, 15/30/60/75 /110CD, 100dBA @ 10`, RED
41. Pull Station for Fire Suppression Release
42. 6" Motor bell (UL)
43. Battery Backup
44. Abort Switch
45. Disable Switch
46. Cylinder FM200 130 l b Assembly Empty SV(Fil l Range 66-131
l bs)
47. Bracket Cylinder 10 Inch Kit (40 lb 80 lb 130 lb Cylinders)
48. SV completer kit
49. Agent FM-200
50. Nozzle 360 1-1/4 (32mm) Brass
51. Supervision, installation, programing, testing and commissioning
52. Air-conditioning Unit
53. 3.0 tr floor mounted package type inverter R401A (includes 10 feet pipe run w/ outdoor bracket
54. Installation and configuration
55. Cablofil - Open Mesh Tray System w/ Bracket & Accessories
56. Bolts and accessories
57. Cable mesh tray 132 (pc/box)
58. Cable tray CF 54/100 EZ cable
59. Kitasstr EZ couplg kit (50sets) bag (50pcs)
60. Wall mounting
61. CM 50 XL GS-MOQ (50 pcs)
62. Floor mount
63. R25 GS-MOQ (50 PCS)
64. Ceiling Mounting
65. Central Hangers
66. Installation and configuration services
67. Grounding System
68. 6 way grounding bus bar
69. copper rods w/ driving head connector 20mm (diameter) 1.5m (length)
70. 20mm copper grounding clamp
71. #6 AWG single stranded ground wire
72. Installation, setup & wire layout
73. Raise Flooring System
74. Supply & installation of Raised Floor Tiles
75. 600mm x 600mm x 20mmh 9m2
76. Pedestal System
77. Compatible w/ solid perforated and granting floors
78. Tube finishes: bare aluminum, e-coat or epoxy powder coat
79. Axial load performance of pedestal assembly is 5, 000kg
80. Data Storage Unity 300
81. 5TB Useable Capacity
82. DAEs: 1 - 25x2.5 DPE
83. [Drives] 3 x 2.5" 200GB eMLC
84. Power Cords: 1 x 125V 10A NEMA 5-15 PWCord Pair
85. IO Modules: 1x 4x16GB SFP
86. 2 x 2.5" 200GB eMLC
87. 5 x 1.8TB 2.5GB SAS Drive
88. Unity Software (CIFS, NFS, FC, iSCSI, Monitoring and Reporting, Unified Snapshots, File Deduplication and Compression, Thin Provisioning, VNXe Event Enabler, File Level Retention) Enhanced Hardware Support (3 years, 24x7, NBD response time) Enhanced Software rt (3 years, 24x7, NBD response time) EMC Professional Services
89. Balance On Core Appliance Dual WAN Route (2WAN) for office/Branch WAN Ports: 2 x GE
90. SpeedFusion Bonding License Key for Balance One/Balance One Core Peplink patent-pending SpeedFusion Technology is a point-to-point true packet level bonding technology. It allows you to create unbreakable VPN, and VOIP or replace expensive MPLS
Other Requirements
91. 1. Installation/Configuration, Commissioning and Testing
A. The new Data Center will be installed in Central Mindanao University main Campus.
B. The provider must ensure that the proposed data center will be compatible with the existing equipment and systems of Central Mindanao University such as personal computers, servers, network equipment, and other devices.
C. Intensive testing should be done by the provider to achieve functionality and benefits of the new data center.
D. Central Mindanao University shall provide the winning bidder with the following:
-c IT Representatives,
-c Work Permits and Access Pass for the winning bidder to implement the job,
-c Provision of temporary area, in which a secured place where the winning bidder can store the delivered materials and tools.
E. The provider must install/setup all components of the Data Center including all necessary accessories.
F. Provide documentation that fully describes configurations of the EMS, Access Control, Fire Suppression System, Grounding System, Data Storage System and providing all necessary information which includes test link result and detailed as-built plan to restore configurations if lost.
92. 2. Training & workshop
The supplier must conduct training/workshop to MIS personnel regarding the datacenter commissioning, familiarization, configuration, troubleshooting and maintenance.
93. 3. The implementation team of the provider must have a license certification
-c EMC Authorized Professional Services Partner
-c Blade/Computing/Server Certifications - Data Center Unified Computing
-c Network Specialization - Advanced Data Center Architecture
-c VMware Certified Professional and Enterprise Partner
94. 4. Maintenance & Technical Support
1. The supplier shall provide highly certified technical personnel to do service for Data Center equipment and all of its component/peripherals whenever problem should occur.
2. On call support shall be available 8 hours a day, 6 days a week. Onsite support must have a response time of not less than 24 hours from the time of the call in cases wherein the phone support could not solve the problem.
3. On any repair, testing shall be done on-site to know the extent of the problem. All components beyond repair shall be replaced at no cost during the effectivity and conditions of the warranty. Replacement parts should be available for the Data Center equipment and components within a day after testing and diagnosis for temporary replacement of the defective unit.
4. Service exchange units must have the same or higher specifications with the defective unit.
5. The supplier must shoulder all expenses of the technical person(s) who will be providing the technical services on-site within the warranty period.
6. Must have a regional presence, to provide immediate response for the support request.
95. 5. Warranty
1. The data center shall be covered by 1 year workmanship warranty.
2. Bidder should have certificates from the manufacturer or their authorized representative that they are authorized to re-sell, install, service and honor warranties issued by the manufacturer.
3. The supplier shall ensure inventory of all critical parts of the Datacenter
4. The winning bidder will provide 1 year System Warranty Extended Product.
5. The supplier must ensure that CMU shall be provided the following:
-c Parts replacement - FREE for the duration of the warranty period.
-c Preventive Maintenance - FREE at least twice a year for the duration of the warranty period.
Pre-bid Conference
DateTimeVenue
12-Mar-20183:00 PMBAC CONFERENCE/ADM.BLDG
Closing Date : 2018-03-23
Documents
Tender Notice