Procurement Summary
Country: Poland
Summary: Prepared by Design Documentation for the Adaptation of an Existing Building Together with the Superstructure of the 4Th Floor into a Dormitory Function of the Junior High School Building in Piaski at Ul. Partyzańskiego19 to the Zs Boarding School...
Deadline: 26 Oct 2026
Posting Date: 16 Oct 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 151065936
Document Ref. No.: 2026/BZP 00491446/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71220000 - Architectural design services
71320000 - Engineering design services
71000000 - Architectural, construction, engineering and inspection services
71242000 - Project and design preparation, estimation of costs
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Prepared by design documentation for the adaptation of an existing building together with the superstructure of the 4th floor into a dormitory function of the Junior High School building in Piaski at ul. Partyzańskiego19 to the ZS boarding school in Piaski...
design documentation for the adaptation of an existing building together with the fourth-story superstructure for a function boarding school building of the Junior High School in Piaski at ul. Partyzantw19 to the ZS boarding school in Piaski
4.1. The subject of the order is the development of design documentation for the task: Adaptation of the existing building together with the fourth-story superstructure into a school dormitory of the Junior High School building in Piaski at ul. Partyzantw 19 for the boarding house of the School Complex in Piaski along with obtaining a building permit.4.2. The scope of the task includes:4.2.1. Vol. I:4.2.1.1. Preparation of the concept of comprehensive reconstruction of the rooms and development of the area within the border of the plot.4.2.1.2. Performing an analysis of implementation costs tasks.4.2.2. Vol. II:4.2.2.1. Preparation of technical expertise in the scope covered by the order4.2.2.2. Preparation of a complete Construction Design including industry-specific designs.4.2.2.3. Preparation of a building adaptation and development project for the areas adjacent to the building, separate from the construction design adopted building. 4.2.3. Vol. III:4.2.3.1. Preparation of a complete Executive Design together with industry-specific projects.4.2.3.2. Preparation of a development project for the areas adjacent to the adopted building, separate from the detailed building adaptation design.4.2.3.3. Exercising supervision in monitoring and supplementing the project at the stage of...
Documents
Tender Notice