Procurement Summary
Country: Poland
Summary: Preparation of Design Documentation for the Task Titled "Reconstruction of the Olszanica Pump Station; Sadlinki Commune, Kwidzyn Poviat, Pomeranian Voivodeship"
Deadline: 12 May 2026
Posting Date: 05 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140683544
Document Ref. No.: 307593-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71320000 - Engineering design services
71242000 - Project and design preparation, estimation of costs
71248000 - Supervision of project and documentation
71250000 - Architectural, engineering and surveying services
71313000 - Environmental engineering consultancy services
71313440 - Environmental Impact Assessment (EIA) services for construction
71322000 - Engineering design services for the construction of civil engineering works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Preparation of design documentation for the task titled "Reconstruction of the Olszanica pump station; Sadlinki commune, Kwidzyn poviat, Pomeranian Voivodeship" Preparation of design documentation for the task titled "Reconstruction of the Olszanica pump station; Sadlinki commune, Kwidzyn poviat, province. "Pomeranian" 1. The subject of the order is the service called "Preparation of design documentation for the task entitled "Reconstruction of the Olszanica pump station; Sadlinki commune, Kwidzyn poviat, Pomeranian Voivodeship." The task is to develop design documentation together with: obtaining all necessary opinions, arrangements, permits and decisions enabling investor supervision and ordering construction works related to the task being performed. As part of the study, the necessary consents and permits must be obtained implementation of the investment consisting in the construction of a new Olszanica Pump Station. It is assumed that the existing pump station should be operational until the new pump station is built and put into operation, and then it should be closed down (demolition). It is allowed other methods of solving the problem of pumping water during the investment proposed by the Contractor and approved by the Ordering Party. The contractor should prepare design documentation and obtain opinions necessary to perform the task, arrangements, permits and decisions. 2. The subject of the order referred to in point 1 includes: a) execution of the basic order (hereinafter referred to as: "Basic Order" or "Basic Task"), including the development of a complete...
Document Type: Contract Notice Reference Number: G.CHAR.270.12.20.2026 Contract Type: services Authority Type: body-pl Doc Title: Preparation of design documentation for the task titled "Reconstruction of the Olszanica pump station; Sadlinki commune, Kwidzyn poviat, province. pomorskie” Dispatch Date: 2026-05-04 Publish Date: 2026-05-05 Submission Date: 2026-05-12
Documents
Tender Notice