Procurement Summary
Country: Poland
Summary: Preparation of Design Documentation for the Task "Construction of a Water Supply Network for the Towns of Kupiatycze, Kniażyce, Koniuszki and Darowice."
Deadline: 01 Jul 2026
Posting Date: 24 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143918205
Document Ref. No.: 2026/BZP 00303400/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71320000 - Engineering design services
71322000 - Engineering design services for the construction of civil engineering works
71310000 - Consultative engineering and construction services
71700000 - Monitoring and control services
71300000 - Engineering services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the order is the execution of the order titled: Preparation of design documentation for the task "Construction of a water supply network for the towns of Kupiatycze, Kniayce, Koniuszki and Darowice." A detailed description of the subject of the order is included in the Description of the Subject of the Order. constituting Appendix No. 11 to the SWZ. 1) Scope of design works: - map area - approx. 219 ha, including: Kniayce approx. 99 ha, Darowice and Koniuszki approx. 75 ha, Kupiatycze approx. 45 ha, - number of inhabitants covered by the scope - approx. 1058, including: Kniayce 438, Darowice 231, Koniuszki 63, Kupiatycze 326. - approximate number of water supply connections to buildings - approx. 355, including: - Kniayce - approx. 140 connections, - Darowice - approx. 75 connections, - Koniuszki - approx. 20 connections, - Kupiatycze - approx. 120 connections. - for each water supply connection, provide for equipping the building with a water meter set for remote reading, compatible with the remote reading system currently owned by the Ordering Party; This requirement should be included in the design documentation, technical solutions, and bill of quantities cost estimates. - at the stage of analysis and development of design documentation, the designer is obliged to determine for each building...
Documents
Tender Notice