Procurement Summary
Country: Poland
Summary: Preparation of Design Documentation for the Construction of a Sanitary Sewage System with Connections and Sewage Pumping Stations for the Towns of Kuźnica Słupska, Zmyślona Słupska and Piaski
Deadline: 12 Feb 2026
Posting Date: 05 Feb 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 135106460
Document Ref. No.: 2026/BZP 00095464/01
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
1. The subject of the order is the preparation of design documentation for the construction of a sanitary sewage system with connections and sewage pumping stations for the towns of Kunica Supska, Zmylona Supska and Piaski. The length of the sanitary sewage system to be designed is approximately 7 080 m, length of the water supply network approx. 1, 800 m. 2. The area covered by the planned network is presented on the maps available in Annex No. 1 to the SWZ Description of the Subject of the Order. The ordering party divided the work into two tasks, which should end in two separate ones decisions on building permits. The tasks specify stages that will allow for a separate tender procedure and implementation of the investment in stages. The tasks are divided into the following stages: TASK 1. Stage I - Zmylona SupskaFrom the end of the existing sewage system in the street Lipowa in the Opatowska ce, at the height of the Lipowa 38 property, along the village of Zmylona Supska up to the property no. 16C, the length of the section is approx. 1560 m, the number of connections is approx. 25 pcs. Stage II Zmylona Supska - Lisiny SupskieFrom the canal from Stage I to the Lisiny Supskie settlement properties no. 26-32, section length approx. 750 m, number of connections approx. 10 pcs. and Stage II a...
Documents
Tender Notice