Procurement Summary
Country: Poland
Summary: Preparation of Design Documentation for the Construction of the Martial Arts Center Building, Including the Hiding Place, Land Development and Technical Infrastructure, as Well as Demolition of the Existing Building....
Deadline: 08 Jul 2026
Posting Date: 30 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144270150
Document Ref. No.: 2026/BZP 00314325/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71220000 - Architectural design services
71320000 - Engineering design services
71248000 - Supervision of project and documentation
71310000 - Consultative engineering and construction services
71242000 - Project and design preparation, estimation of costs
71221000 - Architectural services for buildings
71420000 - Landscape architectural services
71334000 - Mechanical and electrical engineering services
71700000 - Monitoring and control services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Preparation of design documentation for the construction of the Martial Arts Center building, including the hiding place, land development and technical infrastructure, as well as demolition of the existing building.... Preparation of design documentation for the construction of a building Martial Arts Center, including the hiding place along with land development and technical infrastructure, as well as the demolition of the existing building. 1. The subject of the order is: a service consisting in the preparation of design documentation for the construction of the Arts Center building Construction works covering the hiding place along with land development and technical infrastructure as well as demolition of the existing building divided into stages: Stage I: Preparation and agreement with the Ordering Party of the concept and visualization of the design documentation; Stage II: Preparation and submission of complete, multi-discipline design documentation to the Ordering Party; Stage III: Obtaining the final construction permit on behalf of the Ordering Party; Stage IV: Performing author's supervision over the investment carried out on the basis of the documentation design referred to above. The underground part of the designed building will function as a protective structure. The project will be implemented in the Dual-use system in the context of connecting the hiding place with a public building. The underground floor will constitute a hiding place pursuant to Art. 83 of the Act on Civil Protection and Civil Defense of December 5, 2024 (Journal of Laws 2024.1907). A concealment is a building or part of a building with a non-hermetic structure recognized as a protective structure. The task is to include...
Documents
Tender Notice