Procurement Summary
Country: Poland
Summary: Preparation of Design and Cost Estimate Documentation for the Reconstruction of the Pfron Building at Al. Jana Pawła Ii 13 in Warsaw
Deadline: 03 Sep 2026
Posting Date: 29 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146135282
Document Ref. No.: 525305-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71240000 - Architectural, engineering and planning services
72260000 - Software-related services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Preparation of design and cost estimate documentation for the reconstruction of the PFRON building at al. Jana Pawła II 13 in Warsaw 1. The subject of the order is the development of design and cost estimate documentation for the reconstruction of the PFRON building at al. John Paul II 13th century Warsaw. 2. The subject of the order referred to in section 1, includes: 2.1. execution of the basic order (hereinafter referred to as: "Basic order") consisting in the development of complete, multi-discipline design documentation for the reconstruction of the PFRON building together with detailed (industry) designs, architectural and functional concept of the building and land development design along with obtaining all required maps, technical conditions, arrangements and administrative decisions on behalf of the Ordering Party, enabling the conduct of the tender procedure and the implementation of construction works, including obtaining, on behalf and for the benefit of the Ordering Party, on the basis of the granted power of attorney, a building permit or notification of construction works (depending on necessity); 2.2. execution of an optional order including: 2.2.1.Option 1 (hereinafter referred to as "Option 1"), consisting in exercising author's supervision of construction works performed based on the design documentation referred to in point 4.2.1 - a maximum 30 stays on construction site; 2.2.2. Option 2 (hereinafter referred to as "Option 2") consisting in updating investor cost estimates - a maximum of 4 updates; 2.2.3.Option 3 (hereinafter referred to as "Option 3"), which consists in updating the...
Document Type: Contract Notice Contract Type: services Authority Type: body-pl Doc Title: Development of design and cost estimate documentation for the reconstruction of the PFRON building at al. Jana Pawła II 13 in Warsaw Dispatch Date: 2026-07-27 Publish Date: 2026-07-29 Submission Date: 2026-09-03
Documents
Tender Notice