Procurement Summary
Country: Poland
Summary: "Preparation of Complete Design and Cost Estimate Documentation for the Implementation of the Small Lowland Retention Project (Mrn3) in the Złoty Potok Forest District - Third Procedure."
Deadline: 22 Apr 2026
Posting Date: 18 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138036406
Document Ref. No.: 188114-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71322000 - Engineering design services for the construction of civil engineering works
71320000 - Engineering design services
71242000 - Project and design preparation, estimation of costs
71248000 - Supervision of project and documentation
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
1) The subject of the order is the preparation of complete design documentation (hereinafter referred to as the documentation) along with obtaining opinions, arrangements and administrative decisions required by construction law, as well as performing author's supervision for the following task: Name of the task: Reconstruction of retention reservoirs - Krasianów ponds in the Dziadówki forestry Task description: Reconstruction of the retention reservoir - Krasianów ponds in the Dziadówki Forest District by deepening it and strengthening the dyke and securing their slopes with an anti-beaver net and rebuilding hydrotechnical facilities Area of the retention area: 4.5 ha Minimum capacity of small retention facilities: 45, 000.00 m3. Minimum volume of retained water: 25, 000.00 m3. Addresses administrative: Janów commune - rural area, Ponik district, plots no.: 582, 570 Forest addresses: 02-38-1-09-110-c, 02-38-1-09-90 -l -00 - forest address may change due to the new PUL for 2026-2035 Task settlement number: 02-38-1.1-01. Included in in the description of the subject of the order, data in the form of area, capacity and volume should be treated as minimal and necessary to be obtained as part of the project. The Ordering Party allows for an increase in the indicated parameters. Increasing the above-mentioned parameters does not will result in an increase in order fulfillment costs. 2)The subject of the order includes: a) obtaining a complete set of projects, opinions, decisions and arrangements required by law, necessary to obtain a final and valid decision...
Document Type: Contract Notice Reference Number: S.270.8.2026 Contract Type: services Authority Type: body-pl Doc Title: "Preparation of complete design and cost estimate documentation for the implementation of the small lowland retention project (MRN3) in the Złoty Forest District Potok - 3rd proceedings. Dispatch Date: 2026-03-17 Publish Date: 2026-03-18 Submission Date: 2026-04-22
Documents
Tender Notice