Procurement Summary
Country: Bangladesh
Summary: Precautionary protective work along the right bank of Modhumoti river from Km.127.570 to Km.127.650 = 80m from erosion of the Modhumoti river at Chachoi in Modhumoti - Nabaganga Sub-Project under Oper...
Deadline: 21 May 2026
Posting Date: 11 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141045738
Document Ref. No.: 42.01.6500.626.07.007.25.470 Dated 10/05/2026
Competition: NCB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Project Name : Not applicable
Information for Tenderer/Consultant: Eligibility of Tenderer : a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, Vat Registration and TIN certificate.b) Detail Turnover Calculation sheet mentioning the Name of Work, PE name etc (Year wise) duly signed by the Tenderer must be submitted with the tender.c) It is duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not able to open the file, no claim from the tenderer will be entertained regarding the file.d) VAT & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard.e) Evaluation will be done following the latest Gazette/Circular from CPTU and PPR-2025.f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted.g) If any kind of obstacles/structures are needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard.h) If BWDB-owned/acquired land is insufficient to execute the work as per design and specification, the tenderer will do this at his/her own arrangement and cost.i) BWDB's Task Force must check the quantity and quality of work.j) Photo and video must have been taken by the contractor at a different angle during pre-work and post-work m...
Documents
Tender Notice