Procurement Summary
Country : Ireland
Summary : Pre-Qualification Questionnaire for Eastern Garvoge Bridge and Approach Roads Project
Deadline : 15 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 120667283
Document Ref. No. : 5833841
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The proposed Eastern Garvoge Bridge and Approach Roads scheme will provide a new road link in a north south direction crossing the Garvoge River on the eastern side of Sligo City. The total length of the scheme is approximately 2.1km. The proposed scheme will include the following elements from north to south: Short Walk Junction. The existing junction which links Short Walk to the R286 Dromahair Road will be modified to receive a new arm for the Ballinode Link Road. Ballinode Link Road from the R286 Dromahair Road at the existing junction with Short Walk extending in a north-south direction over a length of 400m to the proposed Cushlough priority junction with the Northern Approach Road and Cushlough Link Road, southeast of Glencarrig residential estate. Cushlough Link Road from the N16 Ash Lane Junction running parallel to the southern bank of the Cushlough River in an east-west direction over a length of 300m to the proposed Cushlough priority junction with the Northern Link Road and Ballinode Link Road, southeast of Glencarrig residential estate. Ash Lane Signalised Junction. The existing junction which links the N16 Ash Lane, N16 Manorhamilton Road, R286 Dromahair Road, and R286 Molloway Hill, will be reconfigured to facilitate a new arm for the Cushlough Link Road. Cushlough Priority Junction: a 3-armed junction connecting the Ballinode Link Road, the Cushlough Link Road and the northern approach road to the proposed Eastern Garvoge Bridge. A bridge over the Cushlough River for the Ballinode Link Road. Northern Approach Road extending for a length of 500m from the Cushlough Priority Junction to the Eastern Garvoge River Bridge through undeveloped lands at Rathquarter Hill and Ardaghowen House. This new road will skirt the edge of the Lough Gill Special Area for Conservation (SAC) and curve around the flanks of two small but prominent hills. Northern Garvoge Roundabout at the proposed Eastern Garvoge Bridge so as to facilitate a suitable road alignment for the ...
Documents
Tender Notice