Procurement Summary
Country : Canada
Summary : Pre-Arrival Readiness Evaluation Pare 3.0 Project
Deadline : 22 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 99172000
Document Ref. No. :
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : BUFFALO AND FORT ERIE PUBLIC BRIDGE AUTHORITY
Hamilton-Niagara Peninsula, ON, CAN
Contact Information : Thomas A Boyle, 905.994.3672, tab@peacebridge.com
Canada
Email :tab@peacebridge.com
Tender Details
The Project consists of work to be performed on the Canadian Plaza adjacent to the Peace Bridge that connects Fort Erie, Ontario, Canada and Buffalo, New York, United States of America. The Work to be performed under the Contract generally includes, but will not be limited to the following: Construction of a new steel framed truck canopy Partial demolition and full infill of the existing “East Vault” and adjacent vault areas. Construction of new reinforced concrete shield walls for a multi-energy portal (MEP) equipment. Construction of a new prefabricated concrete mechanical outbuilding to support the MEP equipment. Electrical and communications equipment to support the MEP installation. Electrical and minor structural upgrades to the West Bridge abutment vaults. Installation of variable message signs on the duty free canopy, the Central Avenue Bridge, and the new truck inspection canopy. Demolition of the existing salt storage shelter, and construction of a new, prefabricated steel framed replacement, including new foundations. Civil site improvements including removals, grading, drainage, hydrant, fencing, gates, signage, concrete works, concrete pavement and hot mix paving.
Reference Number : 0000266694
Location : Canada, Ontario, Hamilton-Niagara Peninsula
Job Location : Fort Erie, ON
Description : The Project consists of work to be performed on the Canadian Plaza adjacent to the Peace Bridge that connects Fort Erie, Ontario, Canada and Buffalo, New York, United States of America. The Work to be performed under the Contract generally includes, but will not be limited to the following: Construction of a new steel framed truck canopy Partial demolition and full infill of the existing “East Vault” and adjacent vault areas. Construction of new reinforced concrete shield walls for a multi-energy portal (MEP) equipment. Construction of a new prefabricated concrete mechanical outbuilding to support the MEP equipment. Electrical and communications equipment to support the MEP installation. Electrical and minor structural upgrades to the West Bridge abutment vaults. Installation of variable message signs on the duty free canopy, the Central Avenue Bridge, and the new truck inspection canopy. Demolition of the existing salt storage shelter, and construction of a new, prefabricated steel framed replacement, including new foundations. Civil site improvements including removals, grading, drainage, hydrant, fencing, gates, signage, concrete works, concrete pavement and hot mix paving. :
Documents
Tender Notice