Procurement Summary
Country: France
Summary: Port Olona, Located in Sables-D`Olonne, is a Major Infrastructure for Pleasure. as Part of the "Port Olona 2040" Project, an Overhaul of Technical Installations is Necessary. the Work ...
Deadline: 05 Sep 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 122972861
Document Ref. No.: SAEM-SOP_85_20250718W2_01
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Port Olona, located in Sables-D`olonne, is a major infrastructure for pleasure. As part of the "Port Olona 2040" project, an overhaul of technical installations is necessary. The work aims to modernize the caregiver and to respond to environmental requirements, while reducing The impacts on the natural environment. This project responds to the standards of the water law, covering articles L.214-1 A L.214-6 of the Environment Code. The careful operation, an essential operation for the between boats, generates various pollutants such as heavy metals and biocides present in Paintings. These pollutants represent a threat to marine ecosystems and water quality. The site is located at Port Olona, a port area equipped with a technical platform comprising a 2600 m2 deficient area. The current area is based on a water treatment system by DECANTATION, Insufficient to eliminate micropollutants and toxic substances. The provided improvements include: • The reduction of the surface operates to around 250 m2, to limit polluting releases. • Creation of a new collection and water treatment system. Spatial reorganization aimed at bringing together the careful activities of existing technical installations. The main objectives of the project are: 1.Mi in environmental conformity: responds to legal requirements and improving water management. 2. Protection of aquatic environments: Preserver The quality of coastal waters and sablais marshes. 3. Reduction of environmental impacts: Limiting discharges of particles, heavy metal, and micropollutants. The integral project of modern solutions and adaptable for the management of used waters, ensuring effective pollution treatment before rejection.
Type of step / type of service:-
Public (CT and Assimiles organizations) / Works
Procedure :-
Open adapted procedure 90 k €
Closing date:-
Friday 05 September 2025 - 20:00 (local time of the contracting authority)
Documents
Tender Notice