Cross Icon
Cross Icon

Piehing Catchment Area Survey Tender in Finland - 139919248

The THE CITY OF RAAH has issued a Tender notice for the procurement of a Piehing Catchment Area Survey in the Finland. This Tender notice was published on 22 Apr 2026 and is scheduled to close on 06 May 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 139919248, while the tender notice number is 608005 and Registering on the platform.

Expired Tender

Procurement Summary

Country: Finland

Summary: Piehing Catchment Area Survey

Deadline: 06 May 2026

Posting Date: 22 Apr 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 139919248

Document Ref. No.: 608005

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

The catchment area of ​​Piehinginjoki is approximately 175.67 km² in size. This 50 kilometer long river is located in North Ostrobothnia and flows into the Perämere in Piehing. The catchment area is divided into several smaller areas, such as the lower part, the middle part, Poikajoki, the upper part and To the areas of Ispinäoja. The river's catchment area mainly consists of forest land and swamp and field areas. The upper and middle part of the river is mainly a forest area, downstream the river is located in a cultural landscape and there are more arable land. Piehingjoki is burdened by e.g. runoff from the peat production area and extensive swamp and forest drainage areas. Ispinänjoki flows into Piehingjoki, which originates near the Laivavaari mining area. The operation of the mine can have effects To the water quality of Ispinänjoki and later also to the water quality of Piehinginjoki. Field crops and human settlements in the lower part of the Piehinginjoki can increase the nutrient load in the lower parts of the river. Trees are known to have been floated in the Piehinginjoki at the beginning of the 20th century. There is a bed may have been modified to meet the needs of wood harvesting, but massive (mechanical) riverbed modifications have not been implemented. In the 20th century, the lower part of Pienginjoki has had small-scale hydropower operations, e.g. for running a mill and saw. Also the surrounding area households have received electricity from small hydropower plants. However, the old small hydropower plants have mostly already been dismantled from the riverside. However, there is still a dam on Kettulankoski, which was once built for the mill's needs. Peeing...
Published: 21/04/2026 Deadline for submitting questions: 29/04/2026 Deadline for tenders: 06/05/2026

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Finland

Access a comprehensive library of standard procurement documents specific to Finland. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Finland

Explore Procurement Documents for Finland


Want To Bid in This Tender?

Get Local Agent Support in Finland and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?