Procurement Summary
Country: Canada
Summary: Paved Road Renewal_Construction
Deadline: 10 Apr 2026
Posting Date: 28 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138629691
Document Ref. No.: RFT 2026-06
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Road Renewal Scope of Work:Item 1:6th Ave. from Centre St to Lady of the Lake Existing Asphalt Area = 1320 m2 Mill 25 mm and haul away asphalt millings. Resurface Entire Area = 1320 m2 Apply tack oil to the milled surface. Overlay 1x50 mm asphalt over the entire area flush to restore the road to a smooth driving surface, with no shoulder drop off.Item 2:Ramsay Rd between PR 222 & Boundary RdExisting Asphalt Area = 22, 210 m2 Mill 25 mm and haul away asphalt millings. Exclude the bridge area where newly paved ~115 m. Resurface Entire Area = 22, 210 m2 Apply tack oil to the milled surface. Overlay 1x50 mm asphalt over entire area flush to restore the road to a smooth driving surface, with no shoulder drop off.NOTE: All millings for items to be hauled to the fenced compound at 120 Municipal Dr. Roadworks Completion Date = July 15, 2026
Reference Number : 0000318663 Location : Canada, Manitoba, Interlake Job Location : Gimli Manitoba Purchase Type : Term: 2026/05/01 12:00:00 AM CDT - 2026/07/15 12:00:00 AM CDT Description : Road Renewal Scope of Work:Item 1:6th Ave. from Centre St to Lady of the Lake Existing Asphalt Area = 1320 m2 Mill 25 mm and haul away asphalt millings. Resurface Entire Area = 1320 m2 Apply tack oil to the milled surface. Overlay 1x50 mm asphalt over the entire area flush to restore the road to a smooth driving surface, with no shoulder drop off.Item 2:Ramsay Rd between PR 222 & Boundary RdExisting Asphalt Area = 22, 210 m2 Mill 25 mm and haul away asphalt millings. Exclude the bridge area where newly paved ~115 m. Resurface Entire Area = 22, 210 m2 Apply tack oil to the milled surface. Overlay 1x50 mm asphalt over entire area flush to restore the road to a smooth driving surface, with no shoulder drop off.NOTE: All millings for items to be hauled to the fenced compound at 120 Municipal Dr. Roadworks Completion Date = July 15, 2026 :
Documents
Tender Notice