Procurement Summary
Country: Canada
Summary: Passenger Pavilion and Cruise Building - Security Building Civil Works
Deadline: 25 Jun 2026
Posting Date: 09 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142911130
Document Ref. No.: 810-2501 (A)
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
As part of the ongoing St. John-s Port Authority (SJPA) Improvement Program, the Port has identified the requirement for an improved dockside experience to greet cruise passengers as they enter and exit the Pier. The Cruise Building will consist of two separate components: a seasonal temporary Security Office and a permanent Passenger Pavilion. This document outlines the civil works associated with the Security Building. Detailed design drawings are provided in Appendix A.Scope of Work The contractor shall complete all civil works required to service the buildings. Work includes, but is not limited to: Supply and installation of water service lateral and sanitary sewer lateral from existing tie-in point to the seasonal temporary Security Office internal plumbing connection. All material removal, trenching, excavation, coring, bedding, backfill, reinstatement and surface works. All fittings, valves, connections, and appurtenances required for a complete servicing installation. Coordination with SJPA and relevant authorities for service tie-ins and shutdowns as required.
Reference Number : 0000324146 Location : Canada, Newfoundland and Labrador, Avalon Peninsula Job Location 1 Water Street St. John's, Newfoundland and Labrador Canada A1C 5X8 Description : As part of the ongoing St. John’s Port Authority (SJPA) Improvement Program, the Port has identified the requirement for an improved dockside experience to greet cruise passengers as they enter and exit the Pier. The Cruise Building will consist of two separate components: a seasonal temporary Security Office and a permanent Passenger Pavilion. This document outlines the civil works associated with the Security Building. Detailed design drawings are provided in Appendix A.Scope of Work The contractor shall complete all civil works required to service the buildings. Work includes, but is not limited to: Supply and installation of water service lateral and sanitary sewer lateral from existing tie-in point to the seasonal temporary Security Office internal plumbing connection. All material removal, trenching, excavation, coring, bedding, backfill, reinstatement and surface works. All fittings, valves, connections, and appurtenances required for a complete servicing installation. Coordination with SJPA and relevant authorities for service tie-ins and shutdowns as required. :
Documents
Tender Notice