Procurement Summary
Country: Canada
Summary: Parkview Greenspace Phase Ii - Earthworks and Landscaping
Deadline: 14 May 2026
Posting Date: 02 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140556144
Document Ref. No.: AB-2026-03465
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Work generally comprises of: The development of a green space within the Parkview neighbourhood. The Work will include earthworks grading to achieve the design elevations, placement of owner supplied topsoil and contractor supplied seed, the installation of an asphalt concrete pavement walking trail, a concrete pad, and trail seating nodes, followed by the installation of trees, shrubs, and ground cover as well as site perimeter fence consisting of both post and 3-wire fence as well as post and 3-rail fence. All required storm sewer infrastructure including manholes, catch basins, and underground pipes have been installed as part of a previous phase and are not included within this Scope of Work.
Solicitation Type : ITB - Invitation to Bid (Formal) Reference Number : 00005023668 Location : Alberta Purchase Type : Not Stated Dates Publication : 2026/05/01 10:21:00 AM EDT Closing Date : 2026/05/14 04:00:00 PM EDT Contact Information : Nathaniel Geollegue : ngeollegue@lloydminster.ca : Description : The Work generally comprises of: The development of a green space within the Parkview neighbourhood. The Work will include earthworks grading to achieve the design elevations, placement of owner supplied topsoil and contractor supplied seed, the installation of an asphalt concrete pavement walking trail, a concrete pad, and trail seating nodes, followed by the installation of trees, shrubs, and ground cover as well as site perimeter fence consisting of both post and 3-wire fence as well as post and 3-rail fence. All required storm sewer infrastructure including manholes, catch basins, and underground pipes have been installed as part of a previous phase and are not included within this Scope of Work.
Documents
Tender Notice