Procurement Summary
Country: Canada
Summary: Offshore Platform Hybrid Power System
Deadline: 16 Jan 2026
Posting Date: 13 Dec 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 131985026
Document Ref. No.: OSIP001
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
FORCE is seeking proposals to: Create a plan to design, procure and install a hybrid wind/solar rechargeable power system to power the OSIP floating sensor platform in the Minas Passage. Implement and manage the execution of the plan, in concert with OSIP project team, until the power systems successful commissioning, including SAT, documentation and training.The contractor should provide the following in the proposal: Detailed description of the components to be included in the proposed systems including: Charging components - Rated output curve: power vs. wind speed and irradiance conditions (include expected generation at 4-10 m/s wind and typical solar conditions for Minas Passage) Charge control and load management design: description of how system prioritizes sources (wind/solar/battery) and protects against over-charge/discharge Battery chemistry, quantity, sizing and autonomy calculation; include depth of discharge, cycle life, and environmental derating Cable schedule including sizing and specification Battery storage racking components Inverters - AC/DC pure sine wave and sizing specification, Efficiency summary: overall DC-to-DC and DC-to-AC conversion efficiencies Detailed plan statement for the installation of equipment within a 20” Connex Container on OSIP Platform including: Method of installation Installation schedule Container outfitting/Integration to platform at shipyard Test functionality and verify the operation of the system Environmental & operational r...
Solicitation Type : RFP - Request for Proposal Reference Number : 0000309694 Location : Canada, Nova Scotia, North Shore Purchase Type : Term: 2026/02/02 12:00:00 AM AST - 2026/05/15 12:00:00 AM ADT Description : FORCE is seeking proposals to: Create a plan to design, procure and install a hybrid wind/solar rechargeable power system to power the OSIP floating sensor platform in the Minas Passage. Implement and manage the execution of the plan, in concert with OSIP project team, until the power systems successful commissioning, including SAT, documentation and training.The contractor should provide the following in the proposal: Detailed description of the components to be included in the proposed systems including: Charging components - Rated output curve: power vs. wind speed and irradiance conditions (include expected generation at 4–10 m/s wind and typical solar conditions for Minas Passage) Charge control and load management design: description of how system prioritizes sources (wind/solar/battery) and protects against over-charge/discharge Battery chemistry, quantity, sizing and autonomy calculation; include depth of discharge, cycle life, and environmental derating Cable schedule including sizing and specification Battery storage racking components Inverters – AC/DC pure sine wave and sizing specification, Efficiency summary: overall DC-to-DC and DC-to-AC conversion efficiencies Detailed plan statement for the installation of equipment within a 20” Co...
Documents
Tender Notice