Procurement Summary
Country: USA
Summary: Nrmconst 630A417433 Replace Boiler Plant Main Electrical Switchgear
Deadline: 14 May 2026
Posting Date: 17 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139675452
Document Ref. No.: 36C24226B0042
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Project Number: 630A4-17-433
Project Title: Replace Boiler Plant Main Electrical Switchgear
Scope of work
Completion time: Seven Hundred thirty (730) Calendar Days
Disclosure of the magnitude of construction: Â Between $1, 000, 000 and $5, 000, 000.
Description of Work:
The general contractor (GC) shall follow Architect/Engineer 100% Issue for Construction (IFC) documents to construct and Replace Boiler Plant Main Electrical Switchgear construction project at the VA New York Harbor Healthcare System- St Albans Campus. This work shall include all necessary labor, materials, equipment, and supervision but not limited to:
The project involves the replacement of the main electrical switchgear and transformers, cables, conduits, and associated appurtenances in the Boiler Plant in Building #64 (Boiler Plant). The scope of work is the design of the replacement of Substations #1 and #2, Motor Control Centers #1 and #2, and Transformers A and B. See SOW breakdown by trades as follows.
The Architectural work includes support in building areas affected by the replacement of the main switchgear, which will include firestopping, miscellaneous patching and repair of wall, floor and ceiling finishes and surfaces associated with the proposed electrical work.
The mechanical work includes removing the existing ventilation system and providing a new adequate ventilation system and cooling upgrades to accommodate heat loads generated by new electrical room gear to comply with the VA requirements and the current Mechanical Code of New York State.
The electrical Phased Electrical demolition of switchgear units and associated equipment. Phased installation of new switchgear units and associated equipment. Phasing details are noted with this specification (see section l.6, I.) and on drawings as well. The work phasing sequence of operation was developed to maintain operation of the Boiler Plant during the construction period.
Infection control will be a priorit...
Notice ID: 36c24226b0042
Department/Ind. Agency: veterans affairs, department of
Sub-tier: veterans affairs, department of
Office: 242-network contract office 02 (36c242)
Product Service Code: y1da - construction of hospitals and infirmaries
NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors
Inactive Dates: aug 21, 2026
Inactive Policy: manual
Documents
Tender Notice
Documents.zip