Procurement Summary
Country : USA
Summary : NRM-CONST 528A5-24-516 - Replace 5MV Transformer
Deadline : 23 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122563801
Document Ref. No. : 36C24225B0028
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
Does the acceptance testing of the new transformer need to be completed by NETA certified technicians?YesIs the transformer to be replaced currently de-energized and only being used for backup?The transformer is currently out of service pending repairs scheduled to be completed during Summer 2025. The bidding contractors shall assume the transformer will need to be de-energized prior to work start.Is there a preferred day of the week and time of day for the transformer replacement?There is no preference, coordination with facilities will be required to minimize impact.What is the maximum duration for the redundant transformer to be unavailable during replacement?1 week maximum.Please provide specific details on how the existing transformer being replaced will be turned over. (set to the side of the yard or transported to a designated location?)The transformer can be set to the side within the secure fence in a location to not impede access to other equipment.Does the facility have one-line drawings, as-builts, or design drawings of any kind for the current primary switchgear, transformer, and secondary switchgear?Refer to Attachment B _ ES107 _ Electrical Site Plan This attachment is from the original design at time of award. Actual installation of the transformer may vary slightly.Does the facility know the correct lockout locations to isolate the transformer being replaced?Lockout locations are in the adjacent switchgear within the secure fence area.Please confirm no testing or new terminations are required for the existing MV cables.Testing of new terminations is not required as the existing terminations are to be re-used. Testing may be required if the existing terminations are damaged during construction and need to be replaced.Do you have pictures of the Medium Voltage and Low Voltage connection compartments. Just would like to see the conduit arrangement and the connections.Refer to Attachment A _ Pictures Are transformers in the basis of desi...
Active Contract Opportunity
Notice ID : 36C24225B0028
Related Notice
Department/Ind. Agency : VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier : VETERANS AFFAIRS, DEPARTMENT OF
Office: 242-NETWORK CONTRACT OFFICE 02 (36C242)
General Information
Contract Opportunity Type: Solicitation (Updated)
Updated Published Date: Jul 11, 2025 09:48 am EDT
Original Published Date: Jun 18, 2025 12:40 pm EDT
Updated Date Offers Due: Jul 23, 2025 12:30 pm EDT
Original Date Offers Due: Jul 16, 2025 12:30 pm EDT
Inactive Policy: Manual
Updated Inactive Date: Aug 22, 2025
Original Inactive Date: Sep 14, 2025
Initiative: None
Classification
Original Set Aside:
Product Service Code: 5950 - COILS AND TRANSFORMERS
NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors
Place of Performance:
Documents
Tender Notice
S04-Pre-Bid-Sign-In-Sheet-36C24225B0028-Replac.pdf
S04-Site-Visit-Conference-Agenda-36C24225B0028.docx
36C24225B0028-0001.docx
24-516-Replace-Transformer-Specs.pdf
24-516-Replace-Transformer-Project-location-Map.pdf
24-516-Replace-Transformer-Basis-of-Design.pdf
36C24225B0028_1.docx