Procurement Summary
Country: Canada
Summary: Northwest Drainage Channel - Phase 4 Upgrades
Deadline: 13 Aug 2026
Posting Date: 17 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145335749
Document Ref. No.: 2335017-01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Contractor is hereby notified that the proposed Scope of Work is located within an active refinery owned and operated by Cenovus Energy Inc. as such adherence to specific safety protocols and procedures will be critical. The Contractor awarded this Scope of Work will be deemed Prime Contractor for the Project Site delineated by the safety fence. The Scope of Work generally includes excavation, grading, and delineation of a proposed stormwater pond located adjacent to the Northwest Drainage Channel. The Scope of Work will also involve regrading and construction of stormwater channel slope embankments, stripping and stockpiling of topsoil, excavation to design subgrade elevations including loading, hauling, and offsite stockpiling of excess material, placement of embankment clay fill, storm pond contouring and compaction, and the supply and installation of rock rip-rap at designated locations. Surplus clay fill generated during excavation will be hauled offsite for stockpiling at a location specified by the Engineer. Following the delineation and excavation of the storm pond, the Contractor will be responsible for placing topsoil and Contractor-supplied seed.
The Contractor is hereby notified that the proposed Scope of Work is located within an active refinery owned and operated by Cenovus Energy Inc. as such adherence to specific safety protocols and procedures will be critical. The Contractor awarded this Scope of Work will be deemed Prime Contractor for the Project Site delineated by the safety fence. The Scope of Work generally includes excavation, grading, and delineation of a proposed stormwater pond located adjacent to the Northwest Drainage Channel. The Scope of Work will also involve regrading and construction of stormwater channel slope embankments, stripping and stockpiling of topsoil, excavation to design subgrade elevations including loading, hauling, and offsite stockpiling of excess material, placement of embankment clay fill, storm pond contouring and compaction, and the supply and installation of rock rip-rap at designated locations. Surplus clay fill generated during excavation will be hauled offsite for stockpiling at a location specified by the Engineer. Following the delineation and excavation of the storm pond, the Contractor will be responsible for placing topsoil and Contractor-supplied seed.
Additional Information:
Full Bid Documents and details: https://lloydminster.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/ead6eaaa-1926-4e38-be5a-1b7916096a3d
Competition Type: Invitation to Tender
Open Date : Jul 16, 2026 04:30 PM CST
Close Date : Aug 13, 2026 02:00 PM CST
Documents
Tender Notice