Procurement Summary
Country : Canada
Summary : Newpcc Boiler Replacement 2025-2026
Deadline : 24 Apr 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 117209131
Document Ref. No. : 277-2025
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
D3. SCOPE OF WORKD3.1 The Work to be done under the Contract shall consist of the demolition of existing boilers B5, B5A, B5B and supply, installation, testing and commissioning of two (2) new boilers and associated systems in the existing Boiler 5 room at North End Sewage Treatment Plant (also knownas NEWPCC). In addition, the Work includes the replacement of the existing MCC's and associated work as noted on the electrical drawings.D3.2 The major components of the Work are as follows:(a) Supply and install two (2) new fire tube boilers, BLR-B0005 and BLR-B0006, c/w accessories and chimneys.Related works include:(i) New penetrations in existing roof to accommodate the new chimneys.(ii) Repair and seal around existing wall penetrations.(iii) Provide permanent post supports in basement room beneath new boilers to reinforce floor against the weight of the new boilers.(b) Demolish and removeboiler B5 and associated chimney, piping, electrical, controls, etc. Provide temporary cover for the chimney roof penetration as required.(c) Relocate existing nitrogen tanks.(d) Remove boilers B-5A, and B-5B with associated pumps.(e) Relocate low-flow circulating pump P-B0150 (Previous tag BP-5D.)(f)Supply and install new boiler hot water piping, consisting of:(i) New supply and return lines from the new boilers to the new pumps including tie-ins to existing hot water supply/return piping. A hot tap specialist is required to for the tie-ins to existing piping.(ii) Revise piping servinge...
Reference Number : 0000290780
Location : Canada, Manitoba, Winnipeg
Description : D3. SCOPE OF WORKD3.1 The Work to be done under the Contract shall consist of the demolition of existing boilers B5, B5A, B5B and supply, installation, testing and commissioning of two (2) new boilers and associatedsystems in the existing Boiler 5 room at North End Sewage Treatment Plant (also known as NEWPCC). In addition, the Work includes the replacement of the existing MCC's and associated work as noted on the electrical drawings.D3.2 The major components of the Work are as follows:(a) Supply and installtwo (2) new fire tube boilers, BLR-B0005 and BLR-B0006, c/w accessories and chimneys. Related works include:(i) New penetrations in existing roof to accommodate the new chimneys.(ii) Repair and seal around existing wall penetrations.(iii) Provide permanent post supports in basement room beneath newboilers to reinforce floor against the weight of the new boilers.(b) Demolish and remove boiler B5 and associated chimney, piping, electrical, controls, etc. Provide temporary cover for the chimney roof penetration as required.(c) Relocate existing nitrogen tanks.(d) Remove boilers B-5A, and B-5B withassociated pumps.(e) Relocate low-flow circulating pump P-B0150 (Previous tag BP-5D.)(f) Supply and install new boiler hot water piping, consisting of:(i) New supply and return lines from the new boilers to the new pumps including tie-ins to existing hot water supply/return piping. A hotfacing...
Documents
Tender Notice