Procurement Summary
Country : USA
Summary : Newell Road Bridge Replacement Project Pe-12011
Deadline : 13 May 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 117734610
Document Ref. No. : IFB194068
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Remove a 114-year-old bridge located over San Francisquito Creek spanning between Woodland Avenue (East Palo Alto) and Newell Road (Palo Alto). The existing bridge is approximate 22-ft wide and 80-ft long, and abutments are located within the creek. The proposed bridge is approximately 42.6-ft by 80-ft. Work includes design and install creek protection measure, dewatering plan, demo concrete structures, install new Caltrans standard concrete structures (bridge with reinforced pile abutments, floodwalls and retaining walls), raising the approaches (4-ft - 0) and utility appurtenances (hydrant, valves, cleanouts, laterals, mainlines, manholes, etc.) to grade. Contractor is responsible for the design of retaining walls, complying with environmental permits, preparing plans (traffic control, dewatering, logistics). Additional improvements include permanent creek protection measures, water line relocation, tree removal and new planting. Work within the creek is limited to June 15 - October 15 and all work to be completed within 1.5 years. The project is funded by Highway Bridge Program (HBP), compliance with Caltrans standards and practices is required.The Engineers Estimate for this Project is $12 million.
Documents
Tender Notice